Laserfiche WebLink
� �i� I <br /> . . . , � . ' .}'�. <br /> -e <br /> I i <br /> TEMPC)RARY EROSION AND SEDIMENT CONTROL NOTES: � <br /> , <br /> 1. THIS SEDIMENTATION AND EROSION CONTROL PLAN IS INTENDED TO BE UTILIZED AS A GUIDE � <br /> � T0 CONTROL THE TRANSPORTATION OF LOOSE SOILS FROM THE PROPERTY THAT CAN CAUSE - <br /> WATE=R QUALITY AND NUISANCE PROBLEMS OUTSIDE OF THE CONSTRUCTION AREA. <br /> 2. THE CONTRACTOR SHALL BECOME FAMILIAR WITN, AND CONFORM T0, CITY OF EVERETT ', <br /> STO�MWATER MANAGEMENT MANUAL. ' <br /> 3. APPF�OVAL OF THIS EROSION/SEDIMENTATION CONTROL PLAN DOES NOT CONSTITUTE AN <br /> APPF�OVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, <br /> . PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.). - � <br /> 4. THE IMPLEMENTATION OF THE EROSION AND SEDIMENT CONTROL PLAN AND THE ' ., <br /> CON:�I"RUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE EROSION AND <br /> SEDIMENT CONTROL FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL <br /> CON;�TRUCTION IS COMPLETED. <br /> w 5. THE EROSION AND SEDIMENT CONTROL FACILITIES SHOWN ON THIS PLAN MUST BE . . <br /> CON:�TRUCTED IN CONJUNCTION WITH ALL CONSTRUCTION ACTIVITIES IN SUCH A MANNER AS ` ' <br /> TO I�JSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE DRAINAGE SYSTEM OR � <br /> VIOLf4TE APPLICABLE WATER STANDARDS. <br /> 6. THE EROSION AND SEDIMENT CONTROL FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM ' <br /> REQI)IREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD. <br /> THE��E EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE UPGRADED AS NEEDED fOR <br /> UNE>CPECTED STORM EVENTS AND TO INSURE THAT SEDIMENT — LADEN WATER DOES NOT <br /> LEAWE THE SITE. � <br /> 7. THE EROSION AND SEDIMENT CONTROL FACILITIES ON INACTIVE SITES SHALL BE INSPECTED <br /> AND MAINTAINED PER SPECIFICATIONS. � <br /> . 8. CON�TRACTOR SHALL BE RESPONSIBLE FOR PROPER INSTALLATION, INSPECTION, MAINTENANCE, <br /> AND REMOVAL OF ALL EROSION PREVENTION AND SEDIMENT CONTROL MEASURES. IN ' <br /> ACCCJRDANCE WITH THE CITY, STATE, AND FEDERAL REGULATIONS. RESPONSIBILITY WILL <br /> CON�TINUE UNTIL PERMANENT OR LANDSCAPE IS COMPLETE. <br /> 9. CHE(�K INLET AND OUTLET POINTS REGULARLY, ESPECIALLY AFTER MAJOR STORMS. THE INLET <br /> SHOULD BE FREE OF UNDERCUTIING, AND NO WATER SHOULD BE GOING AROUND THE INLET. IF , <br /> EROSION PROBLEMS EXIST, ANY HOLES, RILLS OR GULLIES SHALL BE FILLED WITH SOIL, ' <br /> COM�'ACTED AND PROTECTED AS NECESSARY WITH APPROPRIATE MATERIALS SUCH AS ' <br /> . <br /> ;II� <br /> ERO:�ION CONTROL BLANKETS OR ROCK. <br /> � 10. PLA��TIC SHEETING SHOULD BE VISUALLY INSPECTED EVERY TWO WEEKS AND AFTER EVERY � I <br /> STOF�M FOR TEARS OR WEAK POINTS. b <br /> , ,, <br /> 11 . ALL CATCH BASINS AND CONVEYANCE LINES SHAL <br /> L BE CLEANED PRIOR TO PAVING. THE ' <br /> EDIMENT LADEN WATER INTO THE DOWNSTREAM , <br /> _ CLEANING OPERATION SHALL NOT FLUSH S , <br /> SYS�'EM. <br /> L EDIMENT BE ALLOWED TO ACCUMULATE MORE THEN ONE—THIRD THE I <br /> NO TIME SHAL S <br /> 12. AT , <br /> HEIGHT OF ANY SEDIMENT CONTRO <br /> L BARRIER. ' <br /> . 13. WAS�TE MATERIALS AND SPOILS SHALL BE PLACED IN A STABLE UPLAND LOCATION ABOVE THE I <br /> TOP OF BANK AND SHALL BE SUITABLY STABILIZED T0 PREVENT EROSION. - � <br /> = I <br /> . o <br /> �,�i <br /> Q 14. ERO:�ION CONTROL MEASURES SHALL BE INSPECTED AND MAINTAINED DAILY TO ENSURE THEIR <br /> C N�TINUED EFFECTIVENESS. <br /> z 0 <br /> o j ,' <br /> � <br /> W OSION AND SEDIMENT CONTROL UPON COMPLETION OF PROJECT. I <br /> � 15. <br /> CON�TRACTOR TO REMOVE ER <br /> ','' i <br /> � ! <br /> ��' 16. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE ANY SEDIMENT <br /> � � ' I <br /> , <br /> � TRAt�KED �FFSITE. <br /> � �I <br /> . <br /> � <br /> � 17. APPi�OPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENTS FROM ENTERING WATERWAYS , ,I <br /> � IF Th1E PROPOSED BMPS FAIL. I <br /> � - 0 0 ,', I <br /> � 1�. BAR�_ AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED F R N � ,, <br /> � PLA�VS AI'PROVED <br /> � MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS „ ! <br /> �.. '� <br /> . � FROM MAY 1 THROUGH SEPTEMBER 30. , � � <br /> � , <br /> PUB RVICES A E I <br /> PUBLIC WORKS: ' I <br /> � DRAINAGE DEPARTMENT �, I <br /> ER ION <br /> � 4 A PUBUC WORKS PERMI7 IS REQUIREDPRIOR ' 'iI <br /> I � CITY ENGIIVEER TO STARTlNG ANY CON�TRUCTION ON THIS <br /> ^ PROJECT. APPRGVAI FOR TtiIS PROJECT IS �I <br /> o I <br /> i'. <br /> ' " O AND EXPIRES UN_ESS PERMIT ` , <br /> COND(TIONAL^s��NT STANDARDS ' <br /> W ., I, <br /> �OR CONSTRt1CTi N HAS BEEN ISSUED <br /> 1� ' I <br /> . p , <br /> � <br /> � � � � � � <br /> � <br /> � DRAWING SCALES SHOWN <br /> o BASED ON 22"x34" DRAWING ' _ <br /> W <br /> O <br /> , Q PROJECT ENGINEER: SCALE: <br /> , � �.F�S��-►ER PORT OF EVERETT °WG. N°. <br /> � �zaNE EC-001 <br /> �, � . <br /> Q� ��p� WASkI�f� DESIGNED BY: DATE: , <br /> . a ��' � �,�ffat� & �,��nO� ,��w ��¢ ��;�� �,, a.Pa-r-rERsoN 20� 5/0�/24 TERM I NAL RAI L U PGRADES ��P No. <br /> o �� ������ o <br /> � 600 UNIVERSITY STREET g� ��'���� P H A S E � 1 -0—0 2 7—0 1 <br /> ,� ��,c DRAWN BY: CHECKED BY: <br /> o� �E�� SUITE#610 � �`�'ss?io�'w w A.MANUZON S.GRAY <br /> � SEATTLE, WA 98101 07 31 15 M&N ISSUED PER ADDENDUM �4 �, �'� ti� w PROJECT � <br /> � � � �s GrsT�� �ti� TESC NC�TES No� MT—RR-2015-05 <br /> � P.O. BGX 538 206-622-0222 � 06/18/15 M&N ISSUED FOR BID AND CONSTRUCTION sI�N���� APPROV <br /> ' EVERE'TT, WA 98206 <br /> q Ph: 425-259-3164 PROJECT N0. 8415-01 <br /> NO. DATE BY REv�s�otv 7 3, 75 ` SHEET NO. �� OF 33 I <br /> , �i / / � <br /> � � <br /> i <br /> � <br /> � � <br />