Laserfiche WebLink
• <br /> •' ; <br /> • <br /> • <br /> CONCOMITANT AGREEMENT <br /> TO REZONE ORDINANCE NO. 5'7„9-f.2 • <br /> THIS AGREEMENT, made and entered into this,; day of Stn 1982, by <br /> and between the City of Everett, a municipal corporation, hereinafter called the • <br /> City, and Tristar Development Co., Inc., hereinafter., called the Owner, <br /> WITNESSETH: <br /> WHEREAS, the Owner has made application to the City for a change in the <br /> • <br /> zoning classification of the following described parcel: <br /> Sec. 12, Twp. 28, Rge. 04 S 197' of fol. desc. tract: Beg. at a pt. <br /> 30' N of SE cor. of SW %4; th W alg. the N bdy. In of Beverly <br /> Park/Mukilteo Rd., a distance of 335' to TPOB; th W on same line <br /> for 162.9' mil, to point 165' E of W line of E Y2 of SE y4• of SW Y4; th <br /> N pll. to W line of SE y4 SW y4 for 275'; th E pll. to S In. of said Sec • <br /> 12 for 162.9' mil to a point 275' N of TPOB; th S 275' to TPOB; • <br /> EXCEPT 10' strip along E line conveyed to Snohomish County for <br /> road. <br /> WHEREAS, such rezoning and development to the new zone standards would <br /> create a situation where business and commercial use would abut a residential <br /> zone; and the public health, safety and welfare would be best served by anticipating <br /> the impact of such development and imposing certain mutually agreed upon <br /> standards, conditions and requirements, <br /> NOW, THEREFORE, IT IS MUTUALLY AGREED AS FOLLOWS: <br /> 1. That detailed drawings shall be submitted to the Public Works <br /> Department showing site parking layout, landscaping, utilities, storm <br /> drainage, temporary construction erosion control and all required <br /> improvements in the public right-of-way. Public Works Department <br /> approval of these drawings is required prior to any permits being issued. <br /> 2. That participation in the cost to fund the South End Sewer Interceptor <br /> is required. The approximate cost based on the preliminary information <br /> provided is $0.234 per ft. The actual cost shall be computed by the <br /> Building Department per the Ordinance in effect at the time and <br /> according to the information provided on the approved plans.on the date <br /> of permit issuance. <br /> 3. That in lieu of providing on-site detention, payment to City Drainage <br /> Fund 340 is required for funding of a regional detention pond. <br /> 4. That all exposed ground must be reseeded within 30 days of the <br /> completion of construction. If reseeding is not practical due to weather <br /> or seasonal problems, the ground must be covered with mulch as <br /> directed by the City Engineer. <br /> • <br /> 5. That as-builts of storm sewer will be required to be submitted as prints <br /> prior to issuance of Occupancy Permit. <br /> 6. That the duplex water service (1") shall be stubbed out from the <br /> Hardeson Road watermain prior to L.I.D. improvements. <br /> 7. That full standard street improvements will be provided under the <br /> Casino Rd. L.I.D. improvement. <br /> 8. That the driveway on Casino Road shall be 5' east of the west property <br /> line. <br /> 1. <br />