My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 852-82
>
Ordinances
>
Ordinance 852-82
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2018 10:37:57 AM
Creation date
6/7/2018 10:37:53 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
852-82
Date
4/21/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a f_ X66 <br /> ORDINANCE NO. $ 3 �_ got, <br /> AN ORDINANCE amending Sections 2 and 9 of Ordinance <br /> No. 787-81 creating a special construction <br /> fund entitled "1981 Block Grant Neighborhood <br /> Improvements Fund No. 349", reallocating the <br /> appropriations for Northeast Everett, Riverside, <br /> Port Gardner, and Lowell <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: That Sections 2 and 9 of Ordinance No. 781-81 which reads as follows: <br /> Section 2: Authorization is hereby given to provide for the development of contract <br /> plans, specifications and detailed cost estimates and construction required to provide <br /> the following: <br /> A. Lowell Neighborhood Improvements <br /> 1. Allocate funds to the-Council for a Greater Everett to provide support <br /> services to the Riverside Neighborhood. (1,000) <br /> 2. Capital Construction Projects. ($95,500) <br /> B. Northeast Everett Neighborhood Improvements <br /> 1. Construct sidewalk on the west side of Walnut from 9th Street to <br /> Butler. ($4,100) <br /> 2. Construct curb, gutter, and sidewalk on both sides of the 1200 block of <br /> Maple. ($51,000) <br /> 3. Continue youth recreation program. ($12,000) <br /> ' 4. $1,000 to the Coucil for a Greater Everett for neighborhood fair share <br /> assistance for support services to Northeast Everett Neighborhood <br /> Organization. <br /> 5. Construct a sidewalk on the south side of Highway 99 from 7th Street to <br /> Walnut ($7,600) <br /> 6. Overlay roadbed on 5th Street from Pilchuck Path to Walnut Street. <br /> ($6,325) <br /> 7. Construct curb, gutter, and sidewalk on the northwest corner of 19th <br /> Street and Pine Street intersection. ($1,900) <br /> C. Riverside Neighborhood Improvements <br /> 1. Replace sections of sidewalk on Highland between 23rd and Everett <br /> Avenue. The following segments are suggested ($8,600) <br /> a. Highland between 23rd and 24th (east side). <br /> (1) 8' sidewalk replaced in front of 2301 Highland. <br /> (2) 184' sidewalk replaced in front of 2305 Highland extending <br /> through 2311 and 2317 Highland. <br /> (3) 58' sidewalk replaced in front of 2329 Highland. <br /> b. Highland between 24th and 25th (east side). <br /> (1) 60' sidewalk replaced in front of 2423 Highland. <br /> (2) 50' sidewalk replaced in front of 2427 Highland. <br /> (3) 225' sidewalk replaced south of 2427 to freeway fence. <br /> - 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.