My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 847-82
>
Ordinances
>
Ordinance 847-82
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2018 10:59:41 AM
Creation date
6/7/2018 10:59:36 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
847-82
Date
4/7/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Phase I shall consist of: <br /> A. The vacation of that portion of Upper Ridge Road lying south of <br /> Glenwood Avenue and north of the proposed intersection of the <br /> realignment, with the existing Upper Ridge Road (see exhibit "A"). <br /> B. The realignment of the northern portion of Upper Ridge Road to <br /> provide an improved intersection with Glenwood Avenue. Said <br /> realignment shall be in accordance with applicable CITY standards <br /> and the attached Exhibit "B". <br /> C. The reconstruction of that portion of the existing Upper Ridge <br /> Road that is to be removed and mined by ASSOCIATED lying <br /> north of the Boeing Haul Road and south of the proposed Phase I <br /> intersection. This replacement section shall be constructed in <br /> accordance with applicable CITY standards and the attached <br /> Exhibit "C". <br /> 5. The CITY agrees to reimburse ASSOCIATED for the engineering design <br /> services for the Upper Ridge Road realignment and reconstruction of <br /> the nonvacated portion of Upper Ridge Road up to a maximum amount <br /> of $12,000. <br /> 6. ASSOCIATED agrees to perform the Phase I construction and any <br /> required utility relocations at no cost to the CITY. Construction shall <br /> commence upon acquisition of all necessary right-of-way and shall be <br /> completed within one year of date on which either excavation of Upper <br /> Ridge Road begins or public use of this portion of Upper Ridge Road is <br /> terminated, whichever is sooner. Should it become necessary, a time <br /> extension may be granted by the CITY. Such an extension shall be <br /> contingent upon an evaluation of ASSOCIATED's efforts to complete <br /> the project within the prescribed one year period. Upon performance of <br /> the construction the CITY shall accept dedication of the right-of-way <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.