My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 847-82
>
Ordinances
>
Ordinance 847-82
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2018 10:59:41 AM
Creation date
6/7/2018 10:59:36 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
847-82
Date
4/7/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S I . <br /> 10. Should ASSOCIATED choose to develop its property prior to the CITY <br /> desiring to acquire the Phase II corridor, this agreement shall not <br /> negate the CITY'S right to require ASSOCIATED to deed land and <br /> construct roads per applicable CITY ordinances. <br /> 11. Upon completion of the Phase I construction and until such time as the <br /> Phase II link is constructed, ASSOCIATED agrees to grant the CITY the <br /> right to interim public use of the Boeing Haul Road between Hardeson <br /> Road and Upper Ridge Road (see exhibit "A"). The CITY will be <br /> • responsible for improvements, maintenance and traffic control which <br /> may be necessary during the public use period and, further, the CITY <br /> shall hold harmless ASSOCIATED from any liability for losses or <br /> damages arising from the temporary public use of the Boeing Haul <br /> Road. Provided that, the grant herein provided shall be permissive by <br /> ASSOCIATED and individuals and the public at large will not be <br /> deemed to have acquired any prescriptive or adverse possession rights <br /> by use in connection with the use of said roadway. <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.