My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/06/06 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/06/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2018 11:42:32 AM
Creation date
6/7/2018 11:42:02 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/6/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. <br /> A RESOLUTION adopting the Annual Transportation Improvement <br /> Program (TIP) update for 2019 to 2024. <br /> WHEREAS,RCW 35.77.010 requires that the legislative body of each city and town <br /> shall prepare and adopt a"Comprehensive Transportation Program"for the ensuing six <br /> calendar years to serve as a guide in carrying out a coordinated transportation facility <br /> construction program, and that said legislative body shall annually thereafter review, <br /> amend as necessary, and readopt said Comprehensive Transportation Program; and <br /> WHEREAS, in compliance with RCW 35.77.010 there exists such a Comprehensive <br /> Transportation Program(known as the Six-year Transportation Improvement Program or <br /> TIP) for the City of Everett that identifies various types of transportation improvements <br /> needed, and estimated costs; and <br /> WHEREAS, The City Council of the City of Everett has reviewed the work <br /> accomplished under said program, determined current and future City transportation <br /> needs, and based on these findings has prepared a Six-year Transportation Improvement <br /> Program for the next six years; and <br /> WHEREAS,Everett's Transportation Advisory Committee and Planning Commission <br /> have reviewed and recommended approval of this update; and <br /> WHEREAS,the adoption of the update to the City of Everett Transportation <br /> Improvement Program authorizes city staff to apply for and receive various state and <br /> federal funds to implement the projects in the program; and <br /> WHEREAS, after due notice, a hearing on the proposed program was held by the City <br /> Council in accordance with RCW 35.77.010; and <br /> WHEREAS,the proposed program is consistent with, and implements the City of Everett <br /> Comprehensive Plan; <br /> NOW, THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY <br /> OF EVERETT that the 2019-2024 annual update of the Six-year Transportation <br /> Improvement Program,a copy of which is attached hereto as Exhibit A and incorporated <br /> herein as if fully set forth, is adopted and the City Engineer is directed to file a copy of <br /> this program with the Washington State Secretary of Transportation pursuant to RCW <br /> 35.77.010 and pursue funding for the projects cited in the program wherever available. <br /> Councilman Introducing Resolution <br /> PASSED and APPROVED this day of June, 2018. <br /> Council President <br />
The URL can be used to link to this page
Your browser does not support the video tag.