Laserfiche WebLink
INSPECTION REPORT <br /> Date 5 ` / Per it: L�� /40/95-0g1/ <br /> Contractor: /l - / ,44, <br /> - �� Owner: / %�i� <br /> ddress: . , l i <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ervice ❑Framing ❑Rooftop Units ❑Water Service <br /> Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ■ eiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> rilectrical Final ❑Shear Nailing GAS PIPE <br /> E WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OT ER OR CONSULTATION: <br /> A <br /> Iro 'ROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS •ERMIT <br /> n • FOR T.C.O. ❑ CORRECTION REQUESTED <br /> A OK FOR C.O. ❑ VIOLATION E <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> If...- <br /> .2 <br /> Inspector: Date: 5 _ <br /> EIR(10/06) DATABAR,INC. <br />