My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1008 GRAND AVE 2018-06-07
>
Address Records
>
GRAND AVE
>
1008
>
1008 GRAND AVE 2018-06-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2018 2:35:39 PM
Creation date
6/7/2018 2:35:37 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1008
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
flol-(D.z� <br /> . _ <br /> v. . . <br /> „„ <br /> • <br /> er4 r_ Residential Photovoltaic OTC Permit Application <br /> Contractors con apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> . . In this Checklist.All project plans and supporting documentation must be provided on site for the Inspector. <br /> • TO BE COMPLETED BY APPLICANT <br /> 0 Project Information • <br /> Property Owner Name: Bradley Gong and Paula Jones <br /> Project Address: 1008 Grand Ave _Parcel# <br /> City: Everett State: WA ZIP: 98201 <br /> Day Phone: 206.919.0824 <br /> Contractor Name Sunergy Systems <br /> Contractor License#: sunersi905d4 <br /> Contractor Day Phone: 206-571-4726 . <br /> PV system description 9.9kw-33 Itek Energy IT300SE modules with APS/BlueFrog <br /> (include manufacturer YC500 Micro-Inverters <br /> and model#of PV . <br /> modules and <br /> Inverters): , <br /> ( Determine if your project qualifies for expedited permitting: <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that <br /> Is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules.[IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by mi O <br /> . the local jurisdiction. <br /> 3, Rooftop is made from lightweight material such'as a single layer of composition shingles, 14 0 <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's instructions.[IRC M2302,2] V 0 <br /> 5. The Installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to Ed 0 <br /> administer the electrical code.[IRC M2302.2] . <br /> 6. The installation shall meet the requirements of the International Fire Code as amended .rzr 0 <br /> by WA State.EIRC M2302.21 <br /> 7. The PV system is designed for the wind speed of the local area,and will be Installed per a 1=1 <br /> the manufacturer's specifications. [IRC M2302.2.1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot.[IRC M2302,2.1(2)] f2I' ❑ <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more thanlour pounds persquare foot.[IRC M2302.2.1(3)] El . 0 <br /> Enter total dead load of system(lbs/ft2): 2.7 <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the 121 0 <br /> roofing to which they are affixed.[IRC M2302.2.1(4)] <br />
The URL can be used to link to this page
Your browser does not support the video tag.