Laserfiche WebLink
\ <br /> PORT OF EVERETT SECTION 00300 <br /> TERMINAL RAIL UPGRADES—PHASE 1 BID FORMS <br /> with any agreement or rules of any group, association, organization or <br /> corporation; Bidder has not directly or indirectly induced or solicited any other <br /> Bidder to submit a false or sham Bid; Bidder has not solicited or induced any <br /> person, firm or corporation to refrain from bidding; and Bidder has not sought <br /> by collusion to obtain for itself any advantage over any other Bidder or over the <br /> Port. <br /> 4. Bidder will complete the work for the following lump sum and unit prices for bid items <br /> as described in Section 01020 and individual specification sections: <br /> SCHEDULE A—BASE BID: TERMINAL RAIL UPGRADES— PHASE 1 <br /> (PRIORITY WORK) CIP NO. 1-0-027-01 <br /> Item Approx. Unit Price Total Price <br /> No. Quantity Description of Item Dirs. Cents Dirs. Cents <br /> 1 Lump Sum Mobilization & Demobilization ---- $ <br /> 2 Lump Sum Field Engineering and Surveying ---- $ <br /> 3 Lump Sum Temporary Erosion and Sediment Control ---- $ <br /> 4 Lump Sum Site Demolition ---- $ <br /> 5 400 LF Track Demolition $ $ <br /> 6 3,488 SY Pavement Sawcut and Removal $ $ <br /> 7 1,722 SY Cold Plane Pavement Removal $ $ <br /> Stockpile and Dispose of Unsuitable Soils for <br /> 8 420 TN Non-Contaminated Disposal //6/7c $ $ <br /> 9 210 TN Stockpile and Haul of Soils for Contaminated $ $ <br /> Disposal I/4 "" <br /> 10 1,200 TN Imported Gravel Borrow `2 $ $ <br /> 11 973 TF T104 Rail Rehab $ $ <br /> 12 88 EA Timber Crossties $ $ <br /> 13 80 TF T104 Rail Reconstruction with Concrete $ $ <br /> Tubs <br /> 14 100 TF 1104 Rail Extension with Concrete Ties $ $ <br /> 15 672 TF T115 Rail Extension with Concrete Tubs $ $ <br /> 16 80 TF T120 Rail Extension with Concrete Tubs $ $ <br /> 17 2 EA Bumping Post $ $ <br /> 18 1 EA No. 11 Turnout $ $ <br /> 19 Lump Sum Utility Removal/Abandonment ---- $ <br /> 20 20 LF Utility Encasement—Concrete < 6-inch Dia. $ $ <br /> 21 48 LF Utility Encasement—Concrete > 6-inch Dia. $ $ <br /> 22 110 LF Utility Encasement—Ductile Iron $ <br /> 23 Lump Sum Relocate Telephone Vault ---- $ <br /> 24 Lump Sum Relocate Storm Sewer ---- $ <br /> 00300- '3 <br />