Laserfiche WebLink
Port of Everett <br /> Terminal Rail Upgrades - Phase 1 <br /> City of Everett Design Review Comments <br /> Last Revised:7/23/2015 (A.Patterson) <br /> Bid Set Review Comments - 7/15/15 <br /> Plans <br /> Reviewer <br /> Sheet Detail Reviewer Comments M&N Response <br /> Initials <br /> 10 Notes RH/SF Add notes as applicable. See redlines provided Applicable notes have been added <br /> Add to "Conc. Curb and Gutter" callout"Per COE Std <br /> 26 1 RH/SF Dwg 305A" Callout has been revised <br /> The detail as shown is preferred. COE Std Dwg 335 is <br /> not large enough diameter or tall enough for the <br /> 26 3 RH/SF Replace bollard detail with COE Std Dwg 335 intended use at the POE site. <br /> 28 Plan RH/SF Are these leaders pointing to the same line?Clarify The leaders are pointing to two separate sewer lines <br /> Megalug joint restraints are specified to be used at all <br /> Add Megalugs as pipe is 12" DI. Conc thrust block ok MJ connections per note 2 on this sheet and the <br /> 29 Plan RH/SF here specifications <br /> Megalug joint restraints are specified to be used at all <br /> As this is DI pipe, use megalug joint restraints in lieu of MJ connections per note 2 on this sheet and the <br /> 29 Plan RH/SF conc thrust blocks specifications <br /> Restraint lengths are shown on sheet 33 (U-007). <br /> Lengths have been updated based on more <br /> 29 Plan RH/SF Note on plans to restrain joints 21-ft either side of bend conservative parameters <br /> 29 Plan RH/SF Do you not have room to put 6-in gate valve here? The gate valve will be moved as shown <br /> Move valve to be here. Use 6-in DI Sleeve coupling and <br /> 29 Plan RH/SF megalugs in place of 6-in gate valve. The gate valve will be moved as shown <br /> Is <br />