Laserfiche WebLink
Page 1 of 2 <br /> TERMS AND CONDITIONS �. <br /> All work performed by ROOFCORP of WA.,Inc.("ROOFCORP")is subject to the following terms and conditions <br /> ACCEPTANCE Until accepted by Customer and countersigned by Inadvertent damage may occur to personal property items that are <br /> ROOFCORP, this Proposal is subject to change or withdrawal displayed, hung, stored, shelved or attached to the structure. Also, <br /> without prior notice and is automatically withdrawn unless accepted minor disturbances to shrubbery and lawn and small divots in the <br /> within thirty(30)days of issue. driveway from heavy equipment such as roll-off trash containers and <br /> dump trucks. Customer is responsible for the security and safety of <br /> PROPOSAL This proposal constitutes the entire understanding of all personal property and the insurance thereof.ROOFCORP will use <br /> the Customer and ROOFCORP. No promise, representation or care and caution in demolition,repair and construction work to avoid <br /> warranty is binding on ROOFCORP unless included in this Proposal and minimize damage to property. The debris generated from this <br /> and agreed to in writing signed by ROOFCORP. process and related procedures may cause inconvenience or <br /> discomfort which is normal construction wear and tear conditions and <br /> CHANGES TO THE WORK This proposal shall be appropriately not ROOFCORP's negligence. However, should accidental damage <br /> adjusted,including an adjustment for profit and overhead,if changes occur, the cost to correct such damage is not included in this <br /> to the Specifications or Work which cause an increase to Proposal. <br /> ROOFCORP's cost of or time required to perform any part of the <br /> Work. The Proposal shall be appropriately adjusted, including an NATURAL PONDING Visible evidence of latent Ponding caused <br /> adjustment for profit and overhead, if there are subsurface latent by structural roof deck deflection often will not be apparent until <br /> conditions not shown on the Specifications, or conditions of an after the existing roof membrane has been removed and the re- <br /> unusual nature which increase ROOFCORP's cost or time required to roofing completed. Customer understands and agrees that should <br /> perform any part of the Work. roof Ponding become evident or occur as a result of the existing roof <br /> membrane removal,and if Ponding is of sufficient quantity or depth <br /> DIFFERING SITE CONDITION Unless otherwise agreed to in to violate the manufacturer's guidelines for warranty issuance, then <br /> writing,ROOFCORP shall not be responsible for the replacement of any corrective work required to assure issuance or validation of the <br /> any lumber,sheathing,trim,rotted wood or electrical and mechanical warranty will be done based upon a contract change order and will be <br /> work.It is agreed that any such Work shall be extra work for which at an additional cost to the base contract. Typical methods used to <br /> ROOFCORP will be paid on a time and material basis, including correct significant Ponding conditions may include gutters,troughs, <br /> profit and overhead. saddles, crickets, sloped sections, drain revisions, and roof leveling <br /> procedures. <br /> PROJECT SEQUENCING ROOFCORP is responsible for <br /> establishing scheduling and sequencing of the Work to be performed. ASBESTOS In the event that ROOFCORP encounters materials that <br /> ROOFCORP shall not be held responsible for the delay, non- may contain asbestos, it shall immediately stop Work. All <br /> delivery, discontinuance, default in shipment by a supplier in whole responsibility and cost, including delays, associated with evaluating <br /> or in part, loss in transit, strikes, lockout or other conditions beyond suspected asbestos,removing asbestos,or otherwise complying with <br /> the control of ROOFCORP. federal, state or other laws and regulations relating to removal or <br /> treatment of asbestos,shall be borne by the customer. <br /> WARRANTIES ROOFCORP warrants that all work shall be <br /> performed in a good and workmanlike manner according to the VENTING ROOFCORP shall not be liable for damage caused by <br /> Specifications. Any applicable manufacturer's warranties will be inadequate venting of roof sheathing and framing should <br /> transferred to the Customer upon payment in full for Work condensation related damage occur during the warranty time allowed <br /> performed. Upon request by Customer, manufacturer's warranties in this Proposal. <br /> are available for review by Customer. THIS WARRANTY IS IN <br /> LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, PERMIT/INSPECTION FEES Customer shall pay all building <br /> INCLUDING ANY WARRANTIES OF MERCHANTABILITY OR permit and/or inspection fees required plus issuance costs. <br /> FITNESS FOR PARTICULAR PURPOSE. <br /> INSPECTOR If an inspector or consultant is brought to the job for <br /> WARRANTY CLAIMS AND LIMITATION ON DAMAGE any reason by ROOFCORP or any other person, this inspector or <br /> Customer will confirm in writing to ROOFCORP's headquarters any consultant must be mutually agreed upon by the Customer and <br /> warranty claims within ten (10) days of discovering the basis for a ROOFCORP. <br /> warranty claim. ROOFCORP's liability for a breach of warranty is <br /> limited to repair and/or replacement of defective Work. ROOFCORP OWNERSHIP Title to material and/or Work furnished under this <br /> will not be responsible for lost profits, special,indirect,incidental or Proposal shall remain the property of ROOFCORP or its assignees <br /> consequential damages. Manufacturer's warranties are subject to any until all payments have been made. It is also agreed that <br /> and all restrictions and limitations contained therein. ROOFCORP will have a security interest in any real property of the <br /> Customer,and the customer will not dispose of the property until the <br /> NATURAL CONDITIONS It is understood and agreed that during work has been paid in full. <br /> the construction Work included in this Proposal or any change orders <br /> that damage may occur to interior finishes,walls and ceilings such as: SUBSTANTIAL COMPLETION Payment is due as set forth in the <br /> nail pops, cracks, breaks, tears, including painted surfaces, and to Proposal. If the Proposal does not contain payment terms,95%of the <br /> other building components such as wiring,fixtures,and trim. price is due upon substantial completion of the Work. <br />