Page 1 of 2
<br /> TERMS AND CONDITIONS �.
<br /> All work performed by ROOFCORP of WA.,Inc.("ROOFCORP")is subject to the following terms and conditions
<br /> ACCEPTANCE Until accepted by Customer and countersigned by Inadvertent damage may occur to personal property items that are
<br /> ROOFCORP, this Proposal is subject to change or withdrawal displayed, hung, stored, shelved or attached to the structure. Also,
<br /> without prior notice and is automatically withdrawn unless accepted minor disturbances to shrubbery and lawn and small divots in the
<br /> within thirty(30)days of issue. driveway from heavy equipment such as roll-off trash containers and
<br /> dump trucks. Customer is responsible for the security and safety of
<br /> PROPOSAL This proposal constitutes the entire understanding of all personal property and the insurance thereof.ROOFCORP will use
<br /> the Customer and ROOFCORP. No promise, representation or care and caution in demolition,repair and construction work to avoid
<br /> warranty is binding on ROOFCORP unless included in this Proposal and minimize damage to property. The debris generated from this
<br /> and agreed to in writing signed by ROOFCORP. process and related procedures may cause inconvenience or
<br /> discomfort which is normal construction wear and tear conditions and
<br /> CHANGES TO THE WORK This proposal shall be appropriately not ROOFCORP's negligence. However, should accidental damage
<br /> adjusted,including an adjustment for profit and overhead,if changes occur, the cost to correct such damage is not included in this
<br /> to the Specifications or Work which cause an increase to Proposal.
<br /> ROOFCORP's cost of or time required to perform any part of the
<br /> Work. The Proposal shall be appropriately adjusted, including an NATURAL PONDING Visible evidence of latent Ponding caused
<br /> adjustment for profit and overhead, if there are subsurface latent by structural roof deck deflection often will not be apparent until
<br /> conditions not shown on the Specifications, or conditions of an after the existing roof membrane has been removed and the re-
<br /> unusual nature which increase ROOFCORP's cost or time required to roofing completed. Customer understands and agrees that should
<br /> perform any part of the Work. roof Ponding become evident or occur as a result of the existing roof
<br /> membrane removal,and if Ponding is of sufficient quantity or depth
<br /> DIFFERING SITE CONDITION Unless otherwise agreed to in to violate the manufacturer's guidelines for warranty issuance, then
<br /> writing,ROOFCORP shall not be responsible for the replacement of any corrective work required to assure issuance or validation of the
<br /> any lumber,sheathing,trim,rotted wood or electrical and mechanical warranty will be done based upon a contract change order and will be
<br /> work.It is agreed that any such Work shall be extra work for which at an additional cost to the base contract. Typical methods used to
<br /> ROOFCORP will be paid on a time and material basis, including correct significant Ponding conditions may include gutters,troughs,
<br /> profit and overhead. saddles, crickets, sloped sections, drain revisions, and roof leveling
<br /> procedures.
<br /> PROJECT SEQUENCING ROOFCORP is responsible for
<br /> establishing scheduling and sequencing of the Work to be performed. ASBESTOS In the event that ROOFCORP encounters materials that
<br /> ROOFCORP shall not be held responsible for the delay, non- may contain asbestos, it shall immediately stop Work. All
<br /> delivery, discontinuance, default in shipment by a supplier in whole responsibility and cost, including delays, associated with evaluating
<br /> or in part, loss in transit, strikes, lockout or other conditions beyond suspected asbestos,removing asbestos,or otherwise complying with
<br /> the control of ROOFCORP. federal, state or other laws and regulations relating to removal or
<br /> treatment of asbestos,shall be borne by the customer.
<br /> WARRANTIES ROOFCORP warrants that all work shall be
<br /> performed in a good and workmanlike manner according to the VENTING ROOFCORP shall not be liable for damage caused by
<br /> Specifications. Any applicable manufacturer's warranties will be inadequate venting of roof sheathing and framing should
<br /> transferred to the Customer upon payment in full for Work condensation related damage occur during the warranty time allowed
<br /> performed. Upon request by Customer, manufacturer's warranties in this Proposal.
<br /> are available for review by Customer. THIS WARRANTY IS IN
<br /> LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, PERMIT/INSPECTION FEES Customer shall pay all building
<br /> INCLUDING ANY WARRANTIES OF MERCHANTABILITY OR permit and/or inspection fees required plus issuance costs.
<br /> FITNESS FOR PARTICULAR PURPOSE.
<br /> INSPECTOR If an inspector or consultant is brought to the job for
<br /> WARRANTY CLAIMS AND LIMITATION ON DAMAGE any reason by ROOFCORP or any other person, this inspector or
<br /> Customer will confirm in writing to ROOFCORP's headquarters any consultant must be mutually agreed upon by the Customer and
<br /> warranty claims within ten (10) days of discovering the basis for a ROOFCORP.
<br /> warranty claim. ROOFCORP's liability for a breach of warranty is
<br /> limited to repair and/or replacement of defective Work. ROOFCORP OWNERSHIP Title to material and/or Work furnished under this
<br /> will not be responsible for lost profits, special,indirect,incidental or Proposal shall remain the property of ROOFCORP or its assignees
<br /> consequential damages. Manufacturer's warranties are subject to any until all payments have been made. It is also agreed that
<br /> and all restrictions and limitations contained therein. ROOFCORP will have a security interest in any real property of the
<br /> Customer,and the customer will not dispose of the property until the
<br /> NATURAL CONDITIONS It is understood and agreed that during work has been paid in full.
<br /> the construction Work included in this Proposal or any change orders
<br /> that damage may occur to interior finishes,walls and ceilings such as: SUBSTANTIAL COMPLETION Payment is due as set forth in the
<br /> nail pops, cracks, breaks, tears, including painted surfaces, and to Proposal. If the Proposal does not contain payment terms,95%of the
<br /> other building components such as wiring,fixtures,and trim. price is due upon substantial completion of the Work.