Laserfiche WebLink
Project: Citywide Intersection Signing Project <br /> Change Order No. 2 <br /> Change Order Effective Date: April 13, 2018 <br /> Exhibit A—Description of Changed Work: <br /> Extension of contract duration. <br /> Exhibit B—Justification: <br /> Concurrent delays including but not limited to material procurement, resolution of above and below <br /> ground conflicts and coordination of required work locations resulted in an extension of the duration of <br /> the project. Since this extension was due to concurrent delays no additional compensation nor credit is <br /> justified. <br /> Exhibit C—Additional Contract Time: <br /> These concurrent delays will require the addition of 112 calendar days to the contract. <br /> Page 3 of 3 <br />