Laserfiche WebLink
INSPECTION REPORT <br /> Date S��J�/� Permit: ��t/���_ <br /> Contractor: _�-�(i(�Gc.-�l� _ __ <br /> Owner: ��.�--K, <br /> SiteAddress: 2��� S�'� �-�S�,J <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Siab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough in <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Ro top Units ❑Water Service <br /> ❑Grounding ❑Insulation echanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: _ _ ��S 3"C��G� ____—_ <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CAL�(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> � <br /> Inspector: Date: � ��� <br /> EIR(10/06) DATABAR,INC. <br />