Laserfiche WebLink
CITY <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this /✓ day of /L2� 2018, by and <br /> between the City of Everett, Washington, a municipal corporation a isting under the laws of the <br /> State of Washington, hereinafter called the "City," and Alpine Waterproofing and Masonry <br /> Restoration, LLC, hereinafter called the "Contractor." <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees <br /> to furnish all labor, tools, materials, equipment, and supplies required to build and construct and <br /> to build and construct in a workmanlike manner the Work, improvements, and appurtenances in <br /> accordance with the Façade Water Investigation documents, Specifications,and the project details, <br /> photos and drawings, Appendix 1 Repair Locations, Appendix 2 Repair Details, Appendix 3 <br /> Construction Record Drawings, Appendix 4 Storefront Shop Drawings: "Everett Station Water <br /> Intrusion Repairs and Brick Restoration", (the "Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorpo- <br /> rated by reference and are hereby made a part of this Contract: <br /> A. Notice to Bidders <br /> B. Instructions to Bidders <br /> C. General Conditions <br /> D. Supplementary Conditions (if any) <br /> E. Drawings, Standard Plans, and Specifications <br /> F. Addenda(if any) <br /> G. Payment and Performance Bond <br /> H. Contractor's Bid Form <br /> I. Other documents described as Contract Documents in Section 072000, General <br /> Conditions <br /> J. All provisions required by law whether set forth and reproduced herein or not <br /> Terms that are capitalized in a Contract Document but not defined in that Contract Document shall <br /> have the meaning defined to them in the other Contract Documents. <br /> 2. Contract Time. Substantial Completion of the Work shall be achieved within ninety(90) <br /> calendar days after the effective date of the Notice to Proceed. Physical Completion shall be <br /> within calendar(30) calendar days after the actual date of issuance of substantial completion and <br /> shall not be later than October 15,2018. <br /> 3. Liquidated Damages (NOT USED) <br /> 4. Contract Sum. The amount of this Contract is ($739,800.00)not including Washington <br /> State sales tax, which will be paid when invoiced and is based on the bid submitted by <br /> Contractor dated May 15, 2018. The basis for final payment will be the actual amount of work <br /> performed according to the Contract Documents and payments, whether partial or final, shall be <br /> Everett Station Water Intrusion Repairs and Brick Restoration <br /> Page 1 of 4 <br />