My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing and Masonry Restoration 6/13/2018
>
Contracts
>
Agreement
>
Grant
>
Alpine Waterproofing and Masonry Restoration 6/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 11:25:49 AM
Creation date
6/14/2018 9:55:47 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing and Masonry Restoration
Approval Date
6/13/2018
Council Approval Date
5/30/2018
Department
Purchasing
Department Project Manager
Joan Olsen
Subject / Project Title
Everett Station Water Intrusion Repair
Tracking Number
0001281
Total Compensation
$739,800.00
Contract Type
Agreement
Contract Subtype
Grant
Retention Period
6 Years Then Destroy
Document Relationships
ALPINE WATERPROOFING & MASONRY LLC 6/19/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
any of them may be liable. If not specified elsewhere in the Contract, such insurance shall <br /> provide coverage at no less than $2,000,000. The Contractor's policies shall endorse the City, <br /> including its officers, employees, agents and representatives, as additional insureds. The <br /> Contractor shall comply with the insurance requirements set forth in the Contract Documents. <br /> Failure to maintain such insurance shall be a material breach of the Contract. City shall be <br /> entitled to damages for such a breach that include, but are not limited to, any loss (including, but <br /> not limited to, third party litigation expenses and professional fees) suffered by the City if the <br /> City is determined to be solely or concurrently negligent, and if the City suffers any loss or must <br /> pay or defend against any such claim, suit, demand or damage as a result of such breach. <br /> 10. Waiver of Industrial Insurance Immunity. Contractor waives any right of contribution <br /> against the City. It is agreed and mutually negotiated that in any and all claims against the City, <br /> its agents or employees,the Contractor, a subcontractor, anyone directly or indirectly employed <br /> by the Contractor or subcontractor, or anyone for whose acts any of them may be liable,the <br /> defense and indemnification obligations hereunder shall not be limited in any way by any <br /> limitation on the amount of damages, compensation, or benefits payable by or for the Contractor <br /> or any subcontractor under industrial worker's compensation acts, disability benefit acts, or other <br /> employees' benefit acts. Contractor's and City's signatures hereto indicate specific waiver of <br /> Contractor's industrial insurance immunity in order to fulfill this indemnity. Solely for the <br /> purpose of indemnification and defense as provided in this Contract, the Contractor specifically <br /> waives any immunity under the State Industrial Insurance Law, Title 51 RCW. The Contractor <br /> expressly acknowledges that this waiver of immunity under Title 51 RCW was the subject of <br /> mutual negotiation and was specifically entered into pursuant to the provisions of RCW <br /> 4.24.115. <br /> 11. Repair of Damage. The Contractor agrees to repair and replace all property of the City <br /> and all property of others damaged by it, its employees, subcontractors, suppliers and agents. <br /> 12. Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the work under <br /> this contract is to be done at the Contractor's risk and that: (1) prior to submitting its it became <br /> familiar with the conditions of excavation, subsurface, backfill, materials, climatic conditions, <br /> location,traffic, and other contingencies that may affect the work and has made its bid <br /> accordingly and (2)that it assumes the responsibility and risk of all loss or damage to materials <br /> or work that may arise from any cause whatsoever prior to completion. <br /> 13. Headings for Convenience Only. The headings in this document are for convenience <br /> only, and shall not used or considered to interpret or construe this document. <br /> 14. Effective Date. This Contract is effective as of the date of the last person to sign it, and <br /> may be executed in multiple counterparts, each of which shall be deemed an original. <br /> [Remainder of Page Intentionally Left Blank] <br /> Everett Station Water Intrusion Repairs and Brick Restoration Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.