Laserfiche WebLink
0 . <br /> DEverett <br /> TRANSITS ROLE <br /> What We Heard <br /> As part of the Long Range Plan,we asked the public what Everett Transit's role should be in the future. <br /> The first outreach phase focused on the public's vision for future service and their transit values in the <br /> provision of that service. Based on the feedback received, two network options were developed,and the <br /> second outreach phase asked community input on those options. Public preference between those options <br /> guided the Growth Network,which is the direction of growth incorporated inthe Long Range Plan.The third <br /> outreach phase asked the public to review the draft plan,which also incorporated the financial analysis of <br /> our future service. <br /> <--,:>, FEB <br /> KEY 0 Technical milestone I!;(�� Public engagementam, <br /> Draft Long <br /> Range Plan <br /> JAN-APR FEB-MAR Draft Long <br /> UP Information �°� <br /> gathering on outreachRange an <br /> transit trends <br /> MAY-JUN OCT MAY <br /> im Vision outreach Go Service 0 Final Long <br /> 1],t1],tr &values survey 1 options Range Plan <br /> outreach adopted <br /> JUN Goo MAY <br /> UPValues C Final Long <br /> survey Range Plan <br /> analysis publication <br /> 01 02 03 04 Q1 02 <br /> 2017 2018 <br /> I �` <br /> t <br /> ,*.;`''• • OP <br /> = Q,/ ;;;:.;',:7.-'::',3=`;:_° <br /> .fulonnn <br /> 411 •I 1 <br /> 1811111 <br /> 1 <br /> 18 Connecting Your Future <br />