Laserfiche WebLink
9 <br /> of o ulation and er7 of population and <br /> Employees(as of 880h, <br /> Q pp O��p jobs within 1/4 mile <br /> 156 January 2018) V V% jobswithin 112 mile ,� <br /> �� walk to transit i �/ walk to transit <br /> j 1 <br /> 1 L!i -- <br /> rQ Million annualTransit 42 Buses in the Park&ride <br /> 1 ■ / hoardings(2017) centers fleet(as of lots served <br /> --- owned ,� � December ,_ <br /> 20171 Mt V <br /> Current Operations and Maintenance Base conditions include: <br /> / The Operations Base is at its maximum parking capacity, housing the current fleet of 42 buses, diesel <br /> and hybrid-electric.The conversion to electric vehicles will constrain parking capacity, due to the <br /> addition of charging stations,to parking no more than 18 all-electric and 14 diesel & hybrid-electric <br /> vehicles (fora total of 321.As electric vehicles are added to the fleet,temporary arrangements with <br /> the Public Works department are made to accommodate buses across the street from the Operations <br /> building. <br /> The Everett Transit paratransit fleet of 29 vans is currently located at a leased location. <br /> In 2017, Everett Transit purchased a site adjacent to the Everett Station property that can accommodate <br /> both the fixed-route and paratransit fleet in the future, to be developed as funding is available. <br /> 6 <br /> '� f 5 . <br /> ., �, f ' ke7,s <br /> tie- <br /> - <br /> . --— -- HYBRID 7 --c ;a- _ F r <br /> Cl i V OF EVERETT <br /> E lL� 1 Id rll V51L _ <br /> _ y ).-.t- <br /> , ` <br /> I/'" ?OM, i\ -V-. 1 <br /> lI•F: v - <br /> / <br /> ,�1 <br /> 96 Everett Transit Draft Long Range Plan 13 <br />