My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Proterra Inc 6/18/2018
>
Contracts
>
Agreement
>
Grant
>
Proterra Inc 6/18/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 1:29:52 PM
Creation date
6/21/2018 9:35:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Proterra Inc
Approval Date
6/18/2018
Department
Transportation Services
Department Project Manager
Maureen Nikonov
Subject / Project Title
WSDOT Standard Provisions Addendum
Tracking Number
0001284
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Informational Addendum—GCB2819 <br /> Washington's Department of Transportation requires the City of Everett(referred to as the <br /> "CONTRACTOR")to include and manage the following clauses in all contracts and invitations to bid <br /> Section 22 <br /> Loss or Damage to Project Equipment <br /> A. The CONTRACTOR, at its own expense, shall cover any loss, theft, damage, or destruction of the Project <br /> Equipment using either of the following methods: <br /> 1. The CONTRACTOR shall maintain comprehensive and collision insurance for vehicles and property <br /> insurance for non-vehicle equipment adequate to cover the value of the Project Equipment;the <br /> CONTRACTOR shall supply a copy of the Certificate of Insurance specifying such coverage to WSDOT <br /> with the first request for reimbursement, and supply proof of renewal, annually thereafter; or <br /> 2. The CONTRACTOR shall provide a written certificate of self-insurance to WSDOT with the first request <br /> for reimbursement, annually thereafter.The CONTRACTOR will cover from its own resources the costs <br /> of repairing or replacing any Project Equipment, if it is stolen, damaged, or destroyed in any manner. <br /> B. If the damage to the Project Equipment does not result in a total loss, payments for damage shall be <br /> paid directly to the CONTRACTOR. The CONTRACTOR shall, within thirty(30) days, either: <br /> 1. Devote all of the insurance proceeds received to repair the Project Equipment and place it back in <br /> service, and the CONTRACTOR shall, at its own expense, pay any portion of the cost of repair which is <br /> not covered by insurance; or <br /> 2. In the event the CONTRACTOR certified to self-insurance, devote all funds necessary to repair the <br /> Project Equipment and place it back into service. <br /> C. If the Project Equipment is a total loss, either by theft or damage,the insurance proceeds or equivalent <br /> shall be paid directly to WSDOT.The CONTRACTOR shall within sixty(60) days of loss,theft, or damage, <br /> notify WSDOT that it either: <br /> 1. Intends to replace the lost Project Equipment;or <br /> 2. Does not intend to replace the lost Project Equipment. <br /> D. If WSDOT determines that the total loss occurred under circumstances in which the CONTRACTOR <br /> fulfilled its obligations under this AGREEMENT then WSDOT will either pay, or rebate,to the <br /> CONTRACTOR its proportionate share of such proceeds paid to WSDOT. <br /> E. Coverage, if obtained or provided by the CONTRACTOR in compliance with this section, shall not be <br /> deemed as having relieved the CONTRACTOR of any liability in excess of such coverage as required by <br /> the limitation of liability section of this AGREEMENT,or otherwise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.