Laserfiche WebLink
f. Duration of use and subsequent removal of structures. <br /> g. Granting of easements and dedications for roads, walkways, <br /> utilities or other purposes and dedication of land or other <br /> provisions for public facilities, the need for which the <br /> Examiner finds would be generated in whole or in significant <br /> part by the proposed development <br /> h. Provisions which would bring the proposal into compliance <br /> with the Comprehensive Plan <br /> i. Posting of performance bonds as required to insure <br /> compliance with any conditions, modifications and/or <br /> restrictions imposed on the proposal. <br /> 2. For the purposes of this section, the Examiner shall have all the powers <br /> of the Board of Adjustment. <br /> ATTEST: . % <br />