Laserfiche WebLink
'1111S•Ca COST ESTIMATE SHEET <br /> Public Works Department <br /> J y Streets Division <br /> 3200 Cedar Street Everett,WA. 98201 <br /> 425-257-8821 <br /> Fax 425-257-8882 <br /> Date 03/12/2018 <br /> Work Order# <br /> Service Order# <br /> Contact Person Gus Hosn Telephone #206-799-1525 <br /> Requested By <br /> Property Owner(Name) Evolve Consultants LLC <br /> Address: 1621 1861 ST. City Shoreline,WA. Zip 98115 <br /> Installation Location 2123 Harrison AVE. <br /> Installation type/description/size/etc. Repair damaged sidewalk, 29'X 6'X 4"= 2.25 cu. Yd.concrete <br /> 0 The following estimate is based upon the Street Division work group providing all labor and equipment. <br /> • By signing this estimate,you give the City permission to enter upon your private property to complete <br /> the work and to use your outdoor water faucet for the project. <br /> itemized Cost Estimate: <br /> Concrete 2.25 cu.vd. @ $98.50 per cu.vd. <br /> TOTAL 221.62 <br /> prepared by: Bob Soraen Date Estimate Prepared: 03/12/2018 <br /> Accepted by: Representing:,0/1z9G'- eiONSaLi4N2's <br /> (Signature) <br /> Please sign and return estimate to above address,Attn. Bob Sorgen <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> Estimate Only <br /> DO NOT SEND CHECK <br /> • <br /> d;CpMpMoWboN6TREET1NNOwnbVCOBT ESTIMATE SHEETI.Aoo <br /> Scanned by CamScanner <br />