Laserfiche WebLink
Staples Kiosk 5/22/2018 6:32 : 17 PM PAGE 1/001 Fax Server <br /> COST ESTIMATE SHEET <br /> Public Works Department <br /> Streets Division <br /> 3200 Cedar Street Everett WA 98201 <br /> 425-257-8821 <br /> Fax 425-257-8882 <br /> Date 5/18/18 <br /> Work Order# <br /> Service Order# <br /> Contact Person Telephone # <br /> Requested By Pat Mitchell <br /> Property Owner(Name) Mathew Lemmons <br /> Address: 1416 Rockefeller Ave City Everett. Wa Zip 98201 <br /> Installation Location Same as above <br /> Installation type/description/size/etc. remove and replace sidewalk 68'x 6'x 4"and walkway 9.5'x 4'x 4" <br /> 5.5 cu yds concrete $104.50 per vd = $574.75 <br /> Payments of$50.00 per month <br /> ❑ The estimate includes the Street Division work group providing all labor, equipment and restoration. <br /> By signing this estimate, you give the City permission to enter upon your private property to complete <br /> the work and to use your outdoor water faucet for the project. <br /> Itemized Cost Estimate: <br /> Concrete 5.5 yds concrete Cal $104.50 per yd <br /> TOTAL. $ 574.75 <br /> Prepared by: K.C. McAuliffe Date Estimate Prepared: 5/18/18 <br /> • <br /> Accepted by: fes' . - Representing: 114747 7,1 RV 1' L4 W16 <br /> (Signature) <br /> Please sign and return estimate to above address,Attn. Bob Sorgen <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> Cc: Paul Kaftanski <br /> Grant Moen <br /> C:\Users\CopyCenter\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.lE5\X3FIXMST\ICOST ESTIMATE SHEETI.doc <br />