Laserfiche WebLink
Sidewalk COST ESTIMATE SHEET <br /> Public Works Department <br /> _ Streets Division <br /> 3200 Cedar Street Everett WA 98201 <br /> 425-257-8821 <br /> Fax 425-257-8882 <br /> Date May 30, 2012 <br /> Work Order # <br /> Service Order # <br /> Contact Person Bill Watt _Telephone # 425-530-7216/360-794-5752 <br /> Requested By Bill Watt (Eric Watt 425-299-2306) <br /> Property Owner (Name) Bill Watt (Bill's Blueprint) — <br /> Address: 27130 Old Owen Road City Monroe Zip 98272 <br /> Installation Location 2920 Rockefeller AVE. <br /> Installation type/description/size/etc. Sidewalk= 110' X 11.5' X 4" = 16 Yards concrete <br /> *City pays for curb <br /> 17 The following estimate is based upon the Street. Division work group providing all labor and equipment. <br /> Itemized Cost Estimate: <br /> Labor & Benefits 0 <br /> Material Concrete = 16 Yards (a $87.75 Per Yard <br /> Equipment Rental 0 <br /> Surface Restoration 0 <br /> Sales Tax 0 <br /> TOTAL $1,404.00 <br /> Once the work is complete and I am billed I would like to set up monthly payment arrangements. <br /> Prepared by: Mike Hale 425-257-8835� � Date Estimate Prepared: May 30, 2012 <br /> ' <br /> � <br /> Accepted by: � ��(sem.– v Representing: <br /> (Signature) <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> Cc: Dave Davis Estimate Only <br /> Mark SaviP.E. DO NOT SEND CHECK <br /> C\Documents and Settings\MHale\Desktop\!COST ESTIMATE SHEETI.doc <br />