Laserfiche WebLink
ELECTRICAL <br />❑ Temp Service <br />❑ Groundwork <br />❑ Slab/Conduit <br />❑ Rough In <br />❑ Service <br />❑ Grounding <br />❑ Ceiling Grid <br />❑ Electrical Final <br />SITE WORK <br />❑ Footing drains <br />❑ Roof drains <br />INSPECTION REPORT <br />I *qq Permit: -__- <br />'-actor: WH10 _ <br />,r [,Mli 5 <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />❑ LIFER ground <br />❑ Footing <br />Foundation <br />❑ Structural Slab <br />❑ Framing <br />❑ Insulation <br />❑ Drywall Nailing <br />❑ Shear Nailing <br />❑ Roof Nailing <br />❑ Ceiling Grid <br />❑ Building Final <br />OTHER OR CONSULTATION: <br />MECHANICAL <br />❑ Groundwork/Slab <br />❑ Rough In <br />Ceiling Grid <br />❑ OK to insulate <br />Rooftop Units <br />D41mechanical Final <br />GAS PIPE <br />❑ Rough In/Service <br />❑ Refrigeration <br />❑ Gas Pipe Final <br />PLUMBING <br />❑ Groundwork/Slab <br />❑ Rough In <br />Ceiling Grid <br />❑ OK to insulate <br />❑ Water Service <br />❑ Medical Gas <br />❑ Plumbing Final <br />Hot Water Tank <br />❑ Rough in <br />❑ HWT Final <br />❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br />OK FO ❑ VIOLATION <br />BLE TO PERFORM INSPECTION: _ <br />❑ CALL (425) 257-8881 FOR REINSPECTION — 24 hour notice required <br />/ 7 <br />&TABAR, INC. <br />EIR (10/06) <br />