My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8019 UPPER RIDGE RD 2018-06-27
>
Address Records
>
UPPER RIDGE RD
>
8019
>
8019 UPPER RIDGE RD 2018-06-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2018 1:22:24 PM
Creation date
6/27/2018 1:22:20 PM
Metadata
Fields
Template:
Address Document
Street Name
UPPER RIDGE RD
Street Number
8019
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ <br /> PROJECT ROUTING FROM DEVELOPMENT TECHNICIAN <br /> (Public Works ! Permit Services) <br /> Routed Date: 4/10/2018 <br /> Permit#: PW1804-015 <br /> PROJECT ADDRESS: 5427 BROADWAY <br /> DESCRIPTION OF WORK: 280332 COMCASTIPACIFIC CABLE <br /> PLANNING REFERENCE#'s(if applicable): <br /> PRE-APP MEETING #: <br /> LAND USE PROJECT#: <br /> PUBLIC WORKS REVIEWER: <br /> REQUEST: Please review the attached material for your area of concern and return any comments <br /> and/or redlines to the Public Works Reviewer listed above. <br /> ROUTED TO: <br /> ❑ Stormwater/Drainage:Jane Zimmerman/Arnie Roshak/Erik Emerson <br /> 12) Traffic: Michael Brick/John Wisdom/ Corey Hert/Steve Sawyer/Tim Miller <br /> ❑ Water:Jim Spooner/T 1 Markham/Rich Hefti/Shane Cavanah <br /> ❑ Sewer. Brian Doolan/Dave Voigt/Arnie Roshak/Mark Sadler <br /> ❑ Planning:Teresa Weldon!Grace Pollard!Kelsey Heyd/Kembra Landry/Dave Tyler/John Jimerson/Steve Ingalsbe <br /> ❑ Building: Drew Martin/James Bronder/Jeff Heilman/Tony Lee <br /> ❑ Fire: Jim Ventura/Bill Armstrong/Chad Harris/Other <br /> ROUTED MATERIALS: c <br /> ❑ Plans APPROVED 27 4/ 0 Original City Comment Letter <br /> Vt Traffic Control Plan ByJWISD at8:54:25AM,4/18/2018 0 Original City Plan Markups <br /> ❑ Drainage Report 0 Original City Drainage Report Markups <br /> ❑ Geotechnical Report 0 SEPA Determination(for reference) <br /> ❑ Wetland Report 0 Preliminary Short Plat Approval(for reference) <br /> ❑ Arborist Report 0 Other: <br /> COMMENTS FROM REVIEWER: (Please make comments below and/or redlines on plans) <br /> STAOS: <br /> [/Approved <br /> ❑ Approved as Noted/Modified <br /> ❑ Revisions Required, See Comments <br /> ❑ Review Not Required <br /> COMMENTS: See TCP sheet for notes. <br /> REVISED 12/07/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.