Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 6/6/2018 15:11 <br /> Issued By HLJ HUSBY,LANCE J. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 5/14/2018 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 15 3 <br /> Title CONVERT.75 INCH 6221 1ST DR SE UT3473-15-3 <br /> Work Order No 20181277 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 5/14/2018 Time 14:49 Original WO Billing <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROGRAM, <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS0184R063 WASRVC YES 5/15/2018 <br /> Address 6221 1ST DR SE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 6221 1ST DR SE <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34145347 ADAPTER 3/4 MIP X 1 IPS INSTA-TITE 1 24.882 05/16/2018 PAP <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 74.399 05/16/2018 PM <br /> M ELL034154947 ELBOW 3/4 NPT 45 DEG STREET BRASS(1/8 BEND) 2 9.282 05/16/2018 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 191.26 05/16/2018 PAP <br /> M NIPP34131247 NIPPLE 3/4 NPT X CLOSE BRASS 1 1.474 05/16/2018 PAP <br /> M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 3 .954 05/16/2018 PAP <br /> M SETT34149747 SETTER COPPER 5/8 X 3/4 HEIGHT 7" NO LEG LENGTH VINO 1 101.54 05/16/2018 PAP <br /> Total Material Cost ($403.7) <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK .25 5.77 05/16/2018 <br /> NA N/A TOPSOIL .13 3.851 05/16/2018 <br />