Laserfiche WebLink
Component Performance Path, pg. 2 ENV-UA <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Jun 2016 <br /> Project Title: Northshore Academy-Pavilion 2 Date 07/01/2016 <br /> Fenestration Area as%gross above-grade wall area 16.3% Max.Target: 30.0% For Building Department Use <br /> Skylight Area as%gross roof area Max.Target: 3.0% <br /> Building Component Proposed UA Target UA <br /> Ins.R Plan/Detail# F-factor Source&Table#8 F-factor x Perimeter =UA(U x A) F-factor x Perimeter= UA(U x A) <br /> R=5 Table A 106.1 (2'horizontal) 0.700 388 271.6 0.540 388 I 209.5 <br /> 0 <br /> 0 R. Slab-On-Grade F-0.54 <br /> L <br /> p� C <br /> c � R- <br /> O -0 R= 0.550 <br /> . 0 <br /> F4 0 <br /> R= Heated Slab-On-Grade F-0.55 <br /> ' R= <br /> Schedule ID U-factor Source9'10 U-factor x Area(A) =UA(U x A; U-factor x Area(A)= UA(U x A) <br /> Storefront door Manufacturer 0.600 270 162.0 0.37 270 99.9 <br /> a, Opaque Swing Doors U-0.37 <br /> Ecn <br /> 0 <br /> 0 <br /> a Sectional Overhead Manufacturer 0.340 192 65.3 0.34 192 65.3 <br /> Opaque rollup&sliding U-0.34 <br /> O <br /> m Vinyl Flange Manufacturer 0.30 536 160.8 0.30 536 I 160.8 <br /> Non-Metal Frame U-0.30 <br /> 0 0 <br /> o 0 Storefront Manufacturer 0.35 431 150.9 0.38 431 163.8 <br /> o0 . Metal Frame,Fixed U-0.38 <br /> 0 <br /> Si 2 <br /> u_ <br /> Q 0.40 <br /> Tcl Metal Frame,Operable U-0.40 <br /> -6 <br /> (I) <br /> U 0 60 <br /> C <br /> Metal Entrance Door U-0.60 <br /> C <br /> m <br /> 2 <br /> g 0.50 <br /> All types U-0.50 <br /> co <br /> Area' UA Area' UA <br /> Page 2 Subtotal 1817 811 1817 699 <br /> Page 1 Subtotal 15242 630 15242 789 <br /> TO COMPLY-The Proposed Total UA shall not - <br /> exceed the Target Total UA. Project Total 17059 1441 17059 1488 <br /> Component Performance Compliance (UA) UA COMPLIES <br /> Note 1-If vertical fenestration or skylight area exceeds maximum allowed per C402.4.1,then Target Area Adjustment of all applicable envelope <br /> elements will be calculated automatically by the compliance form. Refer to Target Area Adjustments worksheet for this calculation. <br /> Note 2-Opaque assembly U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. <br /> Note 3-Proposed CMU mass wall in non-Group R that meet Table C402.1.4 Footnote D requirements can enter the target U-value of 0.014 <br /> Note 4-For semi-heated spaces utilizing the wall insulation exception,enter Target Wall U-factors under Proposed Wall U-factors so exterior <br /> walls are neutral to the calculation. <br /> Note 5-Mass transfer slab edges must be covered with an assembly having an overal U-factor of 0.2. <br /> Note 6-Demising walls,doors,and vertical fenestration separating spaces with different degrees of space conditioning(unconditioned,semi-heated, <br /> fully conditioned)shall be included only on the ENV-UA form for the space with the greatest degree of space conditioning. <br /> Note 7-List Group R above grade mass walls here. List all other mass walls,Commercial and Group R,in the Opaque Walls-Above Grade section. <br /> Note 8 -Slab-on-grade F-Factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. <br /> Note 9 -Opaque door U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1.A door is defined as <br /> opaque if less than 50%of the door area has glazing. <br /> Note 10-Fenestration assembly U-Factors shall be the manufacturer's NFRC product rating,which includes the glazing and frame,or shall be <br /> the default value per Section C303.1.3. <br /> :c%�/ <br />