My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5700 23RD DR W 2018-06-28
>
Address Records
>
23RD DR W
>
5700
>
5700 23RD DR W 2018-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 8:47:07 AM
Creation date
6/28/2018 8:46:35 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5700
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Report <br /> Northshore Christian Church, Building F <br /> 5700 — 23rd Drive West <br /> Everett, Washington <br /> 1.0 PROJECT DESCRIPTION <br /> The project consists of developing the site with a 14,134 square-foot classroom building (known as Building F) <br /> with a basement level and associated access and utilities. Review of Sheet A 1.2, dated October 27, 2016 <br /> indicates the classroom building will be located east of and adjacent to existing Building E. Building F will be a <br /> single-story structure framed over a full depth basement. Basement and main floor elevations will be constructed <br /> at Elev.416.34 feet and 428.0 feet,respectively. Excavation depths are expected to be between 10 and 15 feet for <br /> construction of basement level foundations. A new patio will be constructed north of and adjacent to the building. <br /> A retaining wall will be built on the site's northern slopes for support of patio subgrades. The wall will have a <br /> maximum height of approximately 12 feet. <br /> We expect that the lower level floor will be constructed as a slab-on-grade with wood-framing for the main level. <br /> Foundation loads should be light, in the range of 2 to 5 kips per foot for bearing walls and 25 to 75 kips for <br /> isolated columns. <br /> The recommendations contained in the following sections of this report are based on our understanding of these <br /> design features. If actual features vary or changes are made, we should review them in order to modify our <br /> recommendations, as required. We should review final design drawings and specifications to verify that our <br /> recommendations have been properly interpreted and incorporated into project design. <br /> 2.0 SCOPE OF WORK <br /> Our work was completed in accordance with our Scope and Fee/Work Authorization proposal dated November 3, <br /> 2016. Accordingly, on November 11, 2016, we explored subsurface conditions at the site by excavating 3 test <br /> pits to a maximum depth of 13 feet below current site grades. Using the information obtained from our <br /> subsurface explorations, previous subsurface explorations, and laboratory test results on soil samples, we <br /> performed analyses to develop geotechnical engineering recommendations for project design and construction. <br /> Specifically,this report addresses the following: <br /> • Soil and groundwater conditions <br /> • Geologic hazards areas per City of Everett Municipal Code(EMC) <br /> • Seismic design parameters per 2015 International Building Code(IBC) <br /> • Site preparation and grading <br /> • Excavations and slopes <br /> • Foundation support <br /> • Floor slab-on-grade support <br /> • Drainage <br /> • Utilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.