My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5700 23RD DR W 2018-06-28
>
Address Records
>
23RD DR W
>
5700
>
5700 23RD DR W 2018-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 8:47:07 AM
Creation date
6/28/2018 8:46:35 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5700
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 29,2016 <br /> Project No.T-5922-6 <br /> Accordingly,temporary excavations in Type C soils should be laid back from the toe to the crest of the slope at an <br /> inclination of 1.5:1 or flatter. Temporary excavation side slopes in Type B soil can be laid back at an inclination <br /> of 1`:1. All temporary exposed slopes on excavations that will remain open for an extended time period should be <br /> covered with a durable reinforced plastic membrane during construction to prevent slope raveling and rutting <br /> during periods of precipitation. <br /> Excavations that expose perched or pockets of light seepage can likely be dewatered by conventional sump- <br /> pumping procedures along with a system of collection trenches. Excavations within the advance sands such as <br /> found in Test Pit TP-3 may require dewatering by well points in order to maintain relatively dry working <br /> conditions. <br /> This information is provided solely for the benefit of the owner and other design consultants, and should not be <br /> construed to imply that Terra Associates, Inc. assumes responsibility for job site safety. It is understood that job <br /> site safety is the sole responsibility of the project contractor. <br /> Permanent Slopes <br /> We anticipate restoration of slopes adjacent to patio and retaining wall construction will match the current 3:1 <br /> (H:V) inclination of the existing slopes. In any case, all permanent cut and fill slopes should be graded with a <br /> finished inclination of no greater than 2:1. Upon completion of grading, the slope face should be appropriately <br /> vegetated or provided with other physical means to guard against erosion. Final grades at the top of the slope <br /> must promote surface drainage away from the slope crest. Water must not be allowed to flow uncontrolled over <br /> the slope face. If surface runoff must be directed towards the slope, the runoff should be controlled at the top of <br /> the slope, piped in a closed conduit installed on the slope face, and taken to an appropriate point of discharge <br /> beyond the toe. <br /> 5.4 Foundation Support <br /> The building may be supported on conventional spread footing foundations bearing on subgrades prepared as <br /> recommended in Section 5.2 of this report. Perimeter foundations exposed to the weather should bear at a <br /> minimum depth of 1.5 feet below the final exterior grades for frost protection. Interior foundations can be <br /> constructed at any convenient depth below the floor elevation. <br /> Footings bearing on the medium dense,inorganic silty sand fills, dense outwash sands,or competent structural fill <br /> overlying these soils can be dimensioned for an allowable bearing capacity of 2,500 pounds per square foot(psf). <br /> For short-term transitory loading such as wind and seismic, a one-third increase in this allowable capacity can be <br /> used. With structural loading as anticipated and this bearing stress applied, we estimate total foundation <br /> settlement would be less than one-half inch. • <br /> Page No. 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.