Laserfiche WebLink
6.1.1 Threshold <br /> The PUD No. 1 forecasts an adequate supply of electricity for the SW Everett Subarea. Special <br /> Property Use permits are required for aboveground utility facilities. These reviews will address <br /> landscaping and screening, view and compatibility issues. • <br /> 6.1.3 Mitigation Measures <br /> None <br /> 6.2 NATURAL GAS <br /> 6.2.1 Threshold <br /> 6.2.2 Mitigation Measures <br /> None <br /> Section 7: ENVIRONMENTAL HEALTH <br /> 7.1 NOISE - <br /> 7.1.1 Threshold <br /> 7.1.2 Mitigation Measures <br /> None <br /> Section 8: PUBLIC SERVICES AND UTILITIES <br /> 8.1 FIRE <br /> 8.1.1 Threshold <br /> None <br /> 8.1.3 Mitigation Measures <br /> 1. Water main extensions will be required to serve specific sites. (See Section 8.6: Public <br /> Water Supplies) <br /> 8.2 POLICE <br /> 8.2.1 Threshold <br /> None <br />