Laserfiche WebLink
MN NM <br /> t <br /> '� <br /> March 02, 2017 <br /> Tony Lee <br /> Building Official <br /> City of Everett <br /> 3200 Cedar St. <br /> Everett WA 98201 <br /> Re: Northshore Christian Church B1612-008 <br /> 5700 231d Drive W, Everett, WA 98012-6470 <br /> Tony, <br /> I am writing in reference to your letter dated February 03, 2017. <br /> The following information is in response to the specific items in your letter: <br /> General <br /> 1. An elevator has been added. See revised drawings. <br /> 2. Noted. The kitchen is not in contract currently and will be permitted separately. We're working <br /> with the client right now to determine if they want to include an interceptor or eliminate the <br /> cooktops, hood, and 3-comp sink shown on the plans. <br /> 3. Revised. See Structural Drawings S2.1 & S4.4. <br /> 4. Emergency egress lighting is now provided at the exterior of the building at the exit discharge <br /> locations. See Reflected Ceiling Plan Main Floor on drawing A2.5. <br /> 5. The rise and run are shown on the Wall Sections on drawing A4.3. <br /> 6. The handrail extension requirements are shown on the Wall Sections on drawing A4.3. <br /> 7. Revised. See Lower Floor Plan and Wall Type Schedule on drawing A2.1, and Wall Section #1 <br /> on drawing A4.3. A detail for the fire-resistive lid is shown on drawing A5.4. <br /> 8. Noted and revised. <br /> 9. The number of stalls have been reduced. See Main Floor Plan on drawing A2.2. <br /> 10. A cut-sheet is provided with the revised drawings. <br /> Energy <br /> 1. Revised. See Section Notes on drawings A4.1, A4.2, A4.3, A4.4. <br /> 2. Revised. See Section Notes on drawings A4.1, A4.2, A4.3, A4.4. <br /> 2812 Colby Avenue Everett WA 98201 <br /> P (425)252-2153 F (425)742-8130 s` 1i ) www.2812architecture.com <br />