Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 6/14/2018 8:26 <br /> Issued By HLJ HUSBY,LANCE J. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 5/17/2018 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 15 3 <br /> Title CONVERT.75 INCH 108 61ST PL SE UT3473-15-3 <br /> Work Order No 20181321 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 5/17/2018 Time 14:49 Original WO Billing <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROGRAM. <br /> Structure ID StrTyp Activity Comp! Date Comments <br /> WS0184J039 WASRVC YES 5/21/2018 <br /> Address 108 61ST PL SE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 108 61ST PL SE <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34145347 ADAPTER 3/4 MIP X 1 IPS INSTA-TITE 1 24.882 05/22/2018 PAP <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 74.399 05/22/2018 PM <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 191.26 05/22/2018 PAP <br /> M NIPP34144147 NIPPLE 3/4 NPTX 2 BRASS 1 2.156 05/22/2018 PAP <br /> M SETT34146547 SETTER COPPER 5/8 X 3/4 HEIGHT 9"NO LEG LENGTH HI/HO 1 110.881 05/22/2018 PM <br /> Total Material Cost $403.58 , <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK .25 5.77 05/22/2018 <br /> NA N/A TOPSOIL .13 3.851 05/22/2018 <br /> Total NA Cost $9.62 <br />