My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
615 80TH ST SW 2022-01-03
>
Address Records
>
80TH ST SW
>
615
>
615 80TH ST SW 2022-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:30:11 PM
Creation date
6/28/2018 10:26:31 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
615
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j 3/27/2017 MAIL- MAS COPY <br />PUBLIC WORKS DEPARTMENT <br />Utilities Division, 3200 Cedar Street <br />Everett WA 98201 <br />425-257-8800 <br />• <br />Receipt # Date Paid <br />Cost of Work Order Work Order# <br />X Cost of Service Order $4839.00 Service Order # <br />Contact Person Jim Armstrong Telephone # 206 786-0198 <br />Requested By Sabrina Fandler Date of Request 3-15-2017 <br />Property Owner (name) William B & Susan B Tytus <br />Charge Cost to (name if different than owner) Superstructures Inc <br />Address 2221 Everett Ave City Everett, WA Zip 98201 <br />Installation Location 615 80th St SW <br />Installation type/description/size/etc. <br />6" tap on 12" water main and connect to contractor installed <br />6" D.I.fire line. Contractor to excavate, shore, restore and provide traffic control. Cost of 3/4" <br />detect meter for DCDA has been added to the total ($480.00). <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br />date to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br />installation. <br />'Deposit must be paid prior to ordering parts or scheduling work. <br />'Must have valid Public Works Permit before work can be performed. <br />WATER METERS 3" AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br />Material <br />$1863.00 <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Labor and Benefits <br />$1903.00 <br />Matt Welborn <br />Randy Allen <br />Equipment Rental <br />$384.00 <br />Paul McKee <br />Tax <br />$209.00 <br />Jim Spooner <br />Kirk Brooks <br />Restoration <br />- <br />Sabrina Fandler <br />TOTAL <br />1\ $4839.00 <br />Benyam Stephanos <br />Prepared by: Ji Sooner jA94 Date Estimate Pre aced 3/9/2017 <br />Accepted b Representing <br />P Y �' ,`� <br />E�LATE GOOD FOR 6 MONTHS <br />S:\#Common\ciericaf\Cost.est\20151615 80t' St SW V <br />1of1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.