My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 798-81
>
Ordinances
>
Ordinance 798-81
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 11:06:22 AM
Creation date
6/28/2018 11:06:21 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
798-81
Date
8/12/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • . <br /> • <br /> 1 cost, expense, claim, cause of action or damage resulting from, arising out of or • <br /> 2 proximately caused by the failure to maintain, repair, or reconstruct said walkway and <br /> 3 travelway. <br /> 4 Section 10: That all monies derived from the sale of the above-described <br /> 5 right-of-way vacation shall be deposited in the "Real Property Acquisition Fund." <br /> 6 Section 11: Upon the payment of the required compensation and fulfillment of <br /> 7 each and every condition recited herein, this ordinance shall be recorded with the <br /> 8 Snohomish County Auditor. <br /> 9 <br /> 10 <br /> �L_/ <br /> 11 MAYOR <br /> 12 ATTEST: <br /> dor <br /> 13 <br /> 14 CITY CLERK <br /> 15 <br /> Passed: /a- 8/ <br /> 16 Valid: a2 /c/ <br /> 17 Published: g`30 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br /> 26 <br /> 27 <br /> 28 <br /> 29 <br /> 30 <br /> 31 <br /> 32 -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.