My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 783-81
>
Ordinances
>
Ordinance 783-81
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 11:35:53 AM
Creation date
6/28/2018 11:35:52 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
783-81
Date
5/13/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 17,-;-i f <br /> AN ORDINANCE providing for the improvement of: <br /> The Alley East of Smith Avenue from 38th Street to <br /> 39th Street by the construction of an asphalt concrete <br /> alley, storm drainage system and necessary appurte- <br /> nances; said construction and storm system to include <br /> all incidental material and work necessary for a complete <br /> improvement, <br /> and creating a Local Improvement District Fund <br /> therefor: And providing for the payment of said <br /> improvement by special assessments on the property <br /> in said District under the mode of payment by bonds <br /> or installment notes. <br /> WHEREAS, the City Council has declared its intention to order the <br /> improvement as outlined hereafter and doing all work in connection therewith <br /> to make a complete improvement in accordance with the plans and specifications <br /> of the City Engineer of the City of Everett; and <br /> WHEREAS, the City Council held a hearing on May 13, 1981, after due <br /> public notice; <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: That the City Council of the City of Everett finds and declares <br /> that the improvement hereinafter described is in the public interest and hereby <br /> directs its construction. <br /> Section 2: That an improvement be made of: <br /> The Alley East of Smith Avenue from 38th Street to <br /> 39th Street by the construction of an asphalt concrete <br /> alley, storm drainage system and necessary appurte- <br /> nances; said construction and storm system to include <br /> all incidental material and work necessary for a complete <br /> improvement. <br /> The City may make such changes as determined appropriate in the above locations <br /> and sizes of improvements so long as the purpose and intent of the service is not <br /> altered. All of the aforesaid improvements shall be in accordance with plans <br /> to be prepared by the City Engineer, which plans and specifications are hereby <br /> adopted and approved. <br /> -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.