Laserfiche WebLink
REVISIONS <br /> . cr� <br /> � I-- <br /> ELECTRIC WALL HEATER SCHEDULE z <br /> MECHANICAL ABBREVIATIONS MECHANICAL GENERAL NOTES MECHANICAL LEGEND TAG LOCATION MANUFACTURER AIRFLOW ELECTRICHEATING ELECTRICAL DIMENSIONS WEIGHT NOTES w <br /> /MODEL CAPACITY STAGES FLA MAX FUSE VOLTJPH. (LxWxHT) � <br /> QJ DIAMETER, PHASE CFM K # AMPS AMPS V/0 INxINxIN LBS � <br /> A AIR GENERAL: . v <br /> AAV AUTOMATIC AIR VENT 1. COORDINATE MECHANICAL WORK WITH ELECTRICAL WORK. RE F E R E N C E SYM BO LS EWH-01 COACHES OFFICE 331 Q-MARK CWH3404F 100 3 1 14.5 20 208V/1 16x4x20 22 � SEE NOTES O <br /> ABV ABOVE PROVIDE ADDITIONAL OFFSETS FOR COORDINATED INSTALLATION � <br /> WHERE REQUIRED. NEW MECHANICAL WORK NOTES: <br /> � AC AIR CONDITIONING UNIT z <br /> AD AREA DRAIN,ACCESS DOOR 2. COORDINATE HVAC,AND PIPING WORK PRIOR TO INSTALLATION. __-____ ENLARGED PLAN BORDER 1. 3000W MODELS; PROVIDE WITH MODEL CWH35M SURFACE MOUNTING FRAME AND MODEL LFKSFC 14 GAUGE SECURITY FRONT COVER. THERMOSTAT SHALL BE INTEGRAL. O <br /> DUCTWORKAND EQUIPMENTACCESS TAKES PRECEDENCE OVER <br /> ADA AMERICANS WITH DISABILITIES ACT PIPING FOR AVAILABLE SPACE. � <br /> AFF ABOVE FINISHED FLOOR 3. WHERE USED,THE TERM"PROVIDE" SHALL MEAN°FURNISH AND O 1 DETAIL OR DRAWING IDENTIFIER `,J <br /> AFUE ANNUAL FUEL UTILIZATION EFFICIENCY INSTALL". M2.01 � <br /> AHJ AUTHORITY HAVING JURISDICTION 4. COORDINATE EQUIPMENT CONNECTIONS WITH MANUFACTURERS� Q P I P I N G SYSTE M S I N S U LATI O N SC H E D U L E � <br /> ALT ALTERNATE CERTIFIED DRAWINGS. COORDINATE AND PROVIDE DUCT AND � INDICATES REVISION & NUMBER <br /> PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT <br /> APPROX APPROXIMATE CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND � <br /> ARCH ARCHITECT COORDINATE DUCTAND PIPING DIMENSIONS BEFORE AHU EQUIPMENT IDENTIFIER TYPE OF PIPE INSTALLATION LOCATION INSULATION PIPE SIZE (INCHES) INSULATION THICKNESS (INCHES) ES z <br /> FABRICATION. (TYPE) O <br /> , AMERICAN SOCIETY OF HEATING, REFRIGERATION <br /> ASHRAE AND AIR-CONDITIONING ENGINEERS, INC. 5. PROVIDE MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER � POINT OF CONNECTION INSIDE BUILDING ENVELOPE FIBERGLASS ALL SIZES 1"THICK NOTE 2 U <br /> INSTALLATION OF MECHANICAL SYSTEMS. COLD PLUMBING PIPING <br /> ATM ATMOSPHERE 6. LOCATE VALVES, CONTROLS AND SIMILAR COMPONENTS SO THAT P L U M B I N G OUTSIDE BUILDING ENVELOPE AND BURIED ELASTOMERIC ALL SIZES MULTIPLE LAYERS FOR 1-1/2"TO HICKNESS NOTES 1, 4 <br /> BDD BACKDRAFT DAMPER - __.__�_ ___ THEY ARE ACCESSIBLE. 1-1/4 INCH AND SMALLER 1"THICK <br /> ----��:_=��-�.:_ <br /> WSIDE BUILDWG ENVELOPE FIBERGLASS <br /> BLDG BUILDING 7. C - _TTACHMENTS TO STRUCTURE TO VERIFY THAT HOT PLUMBING PIPING 1-1/2 INCH AND LARGER 1-1/2"THICK NOTE 1 <br /> - -- - DOMESTIC COLD WATER OUTSIDE BUILDING ENVELOPE AND BURIED ELASTOMERIC ALL SIZES MULTIPLE LAYER R 2"TOTAL THICKNESS NOTES 1, 4 <br /> BLW BELOW ATTACHME�? � � � N EQUIPMENT AND STRUCTURE CAN <br /> BOD BOTTOM OF DUCT ACCEPT SEISMIC,WE �-_� D,OTHER LOADS IMPOSED. DOMESTIC HOT WATER NOTES: 1. INCREASE THICKNESS OF PIPE INSULATION BY 1/2 INCH WHERE PIPING IS LOCATED OUTDOORS OR OTHERWISE EXPOSED TO AM �T AIR. <br /> ��-�..� <br /> 8. LOCATIONS AND SIZES OF FLOOR _ � ND ROOF OPENINGS 2. WCLUDE POLYETHYLENE TUBWG. <br /> BOP BOTTOM OF PIPE � �,_ HOT WATER RECIRC <br /> SHALL BE COORDINATED WITH OTHER T , ;1.�IVOLVED. 3. INCLUDE MULTI-PLY LAMINATE JACKET. <br /> BOT BOTTOM INCLUDE IN THE COST OF MECHANICAL WORK; G, CORING, SANITARY SEWER ABOVEGROUND 4. INCLUDE FACTORY APPLIED WEATHERABLE JACKET OR MANUFACTURER RECOMMENDED COATING. <br /> �_ <br /> CAP CAPACITY PATCHING AND PAINTING OF EXISTING WALLS, CEILI ��ORS <br /> AND ROOFS AS REQUIRED TO ACCOMMODATE WORK AS ���� SANITARY SEWER UNDERGROUND <br /> CD CEILING DIFFUSER INDICATED IN THE MECHANICAL CONTRACT DOCUMENTS. �'�a <br /> CFM CUBIC FEET PER MINUTE \ '��. ------- VENT PIPING <br /> 9. BUILDING SPACE IS LIMITED. STRONG ATTENTION TO DETAIL '� D I F F U S E R <br /> �� REGISTER AN RILLE SCHEDULE <br /> CLG CEILING AND CARE MUST BE TAKEN WHEN DEVELOPING SHOP ��.� > > <br /> ��� . <br /> DRAWING SO ROUTING IS COORDINATED WITH OTHER �"� .� P I P I N G E L E M E N TS <br /> CO CLEANOUT �,s TAG MANUFACTURER/MODEL TYPE MATERIAL FINIS FACE FACE DUCT MOUNTING DAMPERS ACCESSORIES NOTES : <br /> DISCIPLINES. ��� ` STYLE SIZE INLET �` '� <br /> CONN CONNECTION `��::� ' ���,�� y <br /> 10. MECHANICAL EQUIPMENT, CONTROL PANELS, MOTOR �'`�" VALVE A TITUS TMSA-AA SQUARE SUPPLY CEILING DIFFUSER AL HITE - NOTE 1 NOTE 3 NOTE 4 NONE NONE <br /> CW DOMESTIC COLD WATER STARTER, MOTOR CONTROLLERS, VARIABLE FREQUENCY �``��� � � <br /> - � ��. ���� . <br /> DEPT DEPARTMENT DRIVES AND SIMILAR EQUIPMENT SHALL CARRY A SHORT ��-pIRECTION OF FLOW B TITUS 50F EGGCRATE RETURN/EXHAUST GRILLE A WHITE - NOTE 2 NOTE 3 NOTE 4 NONE NONE - , `� �.� y :� � �1`���-- <br /> �,. � '�." �' , {� r�'��. <br /> DF DRINKING FOUNTAIN CIRCUIT CURRENT RATING (SCCR) EQUAL TO OR GREATER '� ,, � Q �'i -° � J � �-��? <br /> THAN AVAILABLE FAULT CURRENT DELIVERED FROM -F�� HOSE�E3�l�B � <br /> ELECTRICAL SYSTEM. INCLUDE VISIBLE FACTORY NOTES: � �i `� � ,r�.� T� <br /> DIA DIAMETER �.��l � � � <br /> DIM DIMENSION NAMEPLATE FOR SUCW EQUIPMENT INDICATWG SCCR OF o FLOOR DRATI�;\�` 3253 r.�, : <br /> DN DOWN EQUIPMENT IN ACCORDANCE WITH UL 1995 ANp UL 508A. ��� 1) SEE DRAWINGS FOR FACE SIZE (24x24 OR 12x12). PROVID x24 FOR LAY IN CEILINGS. �'�GIST'��� <br /> CO CLEAN-OUT(FLOOR):� 2) FACE SIZE DETERMINED FROM DUCT INLET SIZE. SSd�����,� . <br /> DWG DRAWING 3) SEE AIR DEVICE TAG FOR DUCT INLET SIZE. � <br /> (E) EXISTING PIPING: , PIPE CONTINUES ��\ 4) COORDINATE BORDER TYPE (SURFACE MOUN AP IN, LAY-IN, SPLINE, DROPPED FACE, AND BEVELED DROP FACE)WITH ARCHITECTURAL CEILING PLANS. � � <br /> EA EACH, EXHAUST AIR 1. VALVES SHALL BE INSTALLED SO THAT VALVE REMAINS IN PIPE CAP ��:;:� <br /> SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE OF `� <br /> EF EXHAUST FAN � VALVE IS REMOVED. PIPE RISING UP ��; <br /> EFF EFFICIENCY � PIPE DROPPING DOWN ���.z,.�., <br /> EG EXHAUST GRILLE HVAC/SHEET METAL: �` <br /> ELEC ELECTRIC � P'PE �°"NE�T'°" DUCT SYSTEMS INSULATION SCHEDULE <br /> 1. PROVIDE TEMPORARY COVERS OVER OPEN ENDS OF EQUIPMENT ��`��� <br /> ELEV ELEVATION AND DUCTWORK DURING CONSTRUCTION. PIPE CONNECTION DOWN �� � <br /> EQUIP EQUIPMENT L�:CATION OF DUCT DUCT SYSTEM TYPE DUCT CONFIGURATION INSULATION TYPE MINIMUM R-VALUE, NOTES <br /> D U CTWO R K ��'�, INSULATION THICKNESS � <br /> ESP EXTERNAL STATIC PRESSURE ENERGY CODE: (WASHINGTON STATE ENERGY CODE-WSEC) ��- � <br /> ET EXPANSION TANK 1. MOTORS: COMPLY WITH MINIMUM FULL LOAD EFFICIENCIES , � , DUCT NOT W N SUPPLY, RETURN, EXHAUST � <br /> EX EXHAUST MANUAL VOLUME DAMPER � RECTANGULAR- EXPOSED RIGID BOARD R-7, 1 LAYER, 2 INCH THICK <br /> LISTED IN THE WSEC. CONDITI D�PACE MIXED, OUTSIDE, AND <br /> °F DEGREES FAHRENHEIT BDD ��t, TRANSFER AIR DUCTS z <br /> 2. PIPING AND DUCT INSULATION: COMPLY WITH THICKNESS AND <br /> �. <br /> FC FLEXIBLE CONNECTOR TYPES LISTED IN THE 1/VSEC. � BACKDRAFT DAMPER �"`��3, RECTANGULAR-CONCEALED DUCT WRAP R-7, 1 LAYER, 3 INCH THICK O <br /> FCO FLOOR CLEANOUT � ��' <br /> 3. RECORD DRAWINGS: PROVIDE PER THE WSEC. ,� � <br /> FD FLOOR DRAIN 4. OPERATION AND MAINTENANCE MANUALS: PROVIDE PER THE �`{�,, ROUND AND OVAL DUCT WRAP R-7, 1 LAYER, 3 INCH THICK � <br /> FLR FLOOR WSEC. � � SUPPLY AIR DUCT SECTION `'��� <br /> FT FEET, FINNED TUBE DUCT WITHW SUPPLY�'4�,ETURN, EXHAUST RECTANGULAR- EXPOSED RIGID BOARD R-3.3, 1 INCH THICK � <br /> � � RETURN/OUTSIDE AIR DUCT SECTI CONDITIONED SPACE GENERATO�;�EXHAUST, RELIEF N <br /> FOIC FURNISHED BY OWNER, INSTALLED BY CONTRACTOR EXISTING MECHANICAL: <br /> AND TRANSFER�aAIR DUCTS RECTANGULAR- CONCEALED DUCT WRAP R-3.3, 1 LAYER, 1-1/2 INCH THICK � <br /> FV FACE VELOCITY � � '�_ <br /> 1. WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE EXHAUST AIR DUCT SECTI � <br /> G GAS MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY ' �"'�.� � <br /> GRD GRILLES, REGISTERS,AND DIFFUSERS INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE ��� ROUND AND OVAL DUCT WRAP R-3.3, 1 LAYER, 1-1/2 INCH THICK <br /> BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK RECTANGULAR DU UP `� W <br /> HB HOSE BIBB AREAS BY MEANS OF TEMPORARY PARTITIONS AND/OR TARPS TO Q <br /> KEEP DUST AND DIRT WITHIN THE CONSTRUCTION AREA. NOTES: �'' <br /> HP HEAT PUMP, HORSEPOWER RECTANG R DUCT DOWN O <br /> HR HOUR 2. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED 1. INSULATE OUTSIDE, EXHAUST,AND RELIEF AIR DUCT�RQM BUILDING ENVELOPE TO BACKDRAFT/MOTORIZED DAMPER WITH R-VALUE EQUAL TO BUILDING ENVELOPE THICKNESS. <br /> HT HEIGHT IN NEW SYSTEMS, EXCEPT WHERE INDICATED AS BEING RO D DUCT UP �ti, � <br /> RELOCATED. `�� <br /> HVAC HEATING, VENTILATION &AIR CONDITIONING 3. WHERE INDICATED, DUCTWORK AND PIPING OR PORTIONS OF �� <br /> HW DOMESTIC HOT WATER DUCTWORK AND PIPING SHALL BE REUSED. REFER TO DRAWING ROUND DUCT DOWN <br /> �� � <br /> HWC DOMESTIC HOT WATER CIRCULATING PLANS FOR POINTS OF CONNECTIONS. �'`� ' <br /> I.E. INVERTELEVATION 4. PROVIDETEMPORARYSUPPORTOFEXISTINGMECHANICAL V`UCT CONSTRUCTION SCHEDULE 0 <br /> SYSTEMS WHERE REQUIRED BY DEMOLITION OR ALTERATION OF D SYM BO LS DUCT LOCATION DUCT TYPE �� DUCT SERVICE PRESSURE MIN SMACNA DUCT NOTES O <br /> IN INCH EXISTING STRUCTURE DURING CONSTRUCTION. COORDINATE � CLASS SEAL CLASS MATERIAL T <br /> LAV LAVATORY WITH GENERAL CONTRACTOR AND PROVIDE ALL NECESSARY YPE C�M AIR DEVICE TAG �� �N i <br /> LB POUND PIPE, DUCT AND EQUIPMENT SUPPORTS AND HANGERS TO � <br /> MAINTAIN INTEGRITY, SAFETY AND PROPER OPERATION OF OUTDOOR EXHAUST EXHA T FANS 2 C GA V <br /> MECH MECHANICAL EXISTING MECHANICAL SYSTEMS FOR THE DURATION OF THE � SUPPLY DIFFUSER � N <br /> MED MEDIUM WORK. FAN COIL, FURNACES, HEAT Pt�J�PS AND TERMINAL UNITS 2 B GA <br /> MFR MANUFACTURER � RETURN OR RELIEF GRILLE CONSTANT VOLUME AIR I-�'A DLING UNITS 2 B GA -J W <br /> DEMOLITION: SUPPLY � Q � <br /> MIN MINIMUM 1. TAKE CAUTION IN DEMOLITION OF MECHANICAL EQUIPMENT. VARIABLE VOLUME AIR HAND�ING UNITS 4 A GA � o <br /> MISC MISCELLANEOUS � EXHAUST GRILLE � � <br /> 2. CONTRACTOR SHALL REMOVE ALL PIPING, DUCTWORK,AND �% FAN COIL, FURNACES, HEAT PUMPS AND�f�RMINAL UNITS 2 B GA � Q? <br /> MS MOP SINK EQUIPMENT REQUIRED TO FACILITATE NEW WORK INCLUDII�ALL � � � � <br /> MTD MOUNTED ASSOCIATED INSULATION, HANGERS,VALVES, PLENUM . ` LS, SIDEWALL GRILLE (SUPPLY), RETURN AIR HANDLING UNITS �=� 2 B GA � � <br /> (N) NEW DAMPERS,WIREMOLD,WIRING, CONTROL.S,AND �r� �-� LOUVER(EXHAUST OR RETURN) EXHAUST FANS � 2 C GA � � <br /> APPURTENANCES ASSOCIATED WITH EACH PIECE O " QUIPMENT. UNCONDITIONED EXHAUST � � w <br /> NA NOT APPLICABLE ,- � � <br /> 3. WHERE EXISTING ITEMS PENETRATE A WALL OI�� OOF, ��_ SIDEWALL GRILLE (RET. OR EXH.), AIR HANDLING UNITS 2 C GA � ,,,, <br /> NO. NUMBER CONTRACTOR SHALL PROVIDE INFILL AT(E) P ETRA710NS LOUVER(OUTSIDE) = w <br /> 1.� FAN COIL, FURNACES, HEAT PUMPS AND TERMINAL UN , 2 C GA CL > <br /> NTS NOT TO SCALE THROUGH WALUROOF WITH LIKE MATERIA�. PATCH&REPAIR � Q <br /> TO MATCH SURROUNDING SURFACES W �L DING PAINT. OUTDOOR AIR AIR HANDLING UNITS \ � 2 C GA � w <br /> POC POINTOFCONNECTION � CONTROLS '� � <br /> 4. CONTRACTOR SHALL PROVIDE TEMP�RARY SUPPORT OF <br /> RA RETURN AIR � FAN COIL, FURNACES, HEAT PUMPS AND TERMINAL UNITS � 2 C GA � O Q <br /> EXISTING MECHANICAL EQUIPMEN�%WHERE REQUIRED BY UV � <br /> RAG RETURN AIR GRILLE CONSTRUCTION. COORDINAT�%�H GC AND PROVIDE � SW TC OL WIRING SUPPLY CONSTANT VOLUME AIR HANDLING UNITS ` 2 C GA � � <br /> DEMOLITION OR ALTERATION OF XISTING STRUCTURE DURING � <br /> RCP REFLECTED CEILING PLAN � � N <br /> REG REGISTER NECESSARY SUPPORTS AN[�HANGERS TO MAINTAIN INTEGRITY, VARIABLE VOLUME AIR HANDLING UNITS 4 A GA <br /> SAFETY AND PROPER OP ATION OF EXISTING MECHANICAL �T ROOM THERMOSTAT FAN COIL, FURNACES, HEAT PUMPS AND TERMINAL UNITS ' 2 C GA <br /> REQD REQUIRED SYSTEMS. <br /> RET RETURN O ROOM SENSOR Z <br /> RETURN AIR HANDLWG UNITS C GA _ <br /> RG RETURN GRILLE CONTROLS: EXISTING�ATS(ALLERTON)CONTROL SYSTEM EXHAUST FANS 2 B GA � W <br /> RH ROOF HOOD � CONDITIONED � <br /> RM ROOM 1. SHALL CON�SiST OF RELOCATING EXISTING THERMOSTATS AND EXHAUST AIR HANDLWG UNITS 2 �� B GA W �� <br /> SA SUPPLY AIR VERIFICA�fON OF THERMOSTAT OPERATION, NO EXCEPTIONS. FAN COIL, FURNACES, HEAT PUMPS AND TERMINAL UNITS 2 C GA Z ��g$ <br /> SAD SUPPLY AIR DIFFUSER � z ~�m � <br /> OUTDOOR AIR AIR HANDLING UNITS 2 C GA o��� <br /> SG SUPPLY GRILLE W ��N � <br /> �- =o <br /> S H E E T M E T A L A N D A I R C O N D I T I O N I N G NOTES � �Q <br /> SMACNA CONTRACTORS' NATIONAL ASSOCIATION, INC. 1. ALL DUCTWORK SHALL BE CONSTRUCTED, SEALED AND ERECTED IN ACCORDANCE WITH THE IMC AND C403.2.7. � o~ <br /> S P E� S P E�,F,�A T,o N ,� M E C H A N I C A L P R O J E C T S C O P E �, N <br /> SUP SUPPLY � � W <br /> � <br /> TAB TESTING,ADJUSTWG AND BALANCING �' <br /> � <br /> TEMP TEMPERATURE ��` THE PROJECT DESCRIPTION IS PROVIDED FOR REFERENCE ONLY. CONTRACTOR SHALL REFER TO THE CONSTRUCTION <br /> TG TRANSFER GRILLE f DOCUMENTS INCLUDING DRAWINGS FOR THE DETAILED SCOPE OF WORK. IN CASE OF CONFLICT BETWEEN THIS DESCRIPTION, M EC HAN AL S H E ET L I ST. <br /> THE DRAWINGS, THE MOST STRINGENT CONDITION SHALL APPLY. <br /> TOD TOP OF DUCT <br /> T'STAT THERMOSTAT THE LIBRARY/GYM TENANT IMPROVEMENT PROJECT SCOPE SHALL INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING M0.1 MECHANICAL GENERAL NOTES, S� HEDULES& DRAWING LIST <br /> TYP TYPICAL 1. THE REMOVAL OF ALL EXISTING CEILING DIFFUSERS, REGISTERS AND GRILLES WITHIN THE LIBRARY AND ASSOCIATED M0.2 MECHANICAL SPECIFICATIONS /� R C H I T E C T U R E <br /> V VENT,VOLTS SPACES BEING CONVERTED. M0.3 MECHANICAL SPECIFICATIONS nacarchitecture.com <br /> VD VOLUME DAMPER 2. THE RELOCATION OF EXISTING THERMOSTATS, TOTAL OF 3, IN ORDER TO PROVIDE TEMPERATURE CONTROL OF THE M0.4 MECHANICAL SPECIFICATIONS zo2s FiRsravENUE � suirE aoo <br /> VEL VELOCITY REVISED ZONES. ' P:2o6.a4�.4szz <br /> SEATTLE WA 98121 <br /> MD1.0 MECHANICAL DEMOLITION FLOOR PLANS <br /> VTR VENT THRU ROOF 3. THE REMOVAL AND RELOCATION OF EXISTING PLUMBING FIXTURES TO ACCOMMODATE NEW LAYOUTS IN BOTH GYM AND � <br /> W WASTE, WATT, WIDTH LIBRARY AREAS. NAc rvo <br /> M1.0 MECHANICAL FLOOR PLANS <br /> 121-16027 <br /> W/ �Ra,wN RSH <br /> WC WATER CLOSET 4. THE INSTALLATION OF NEW SUPPLY AND RETURN DUCTWORK AND ALL ASSOCIATED GRILLES, REGISTERS AND DIFFUSERS. <br /> CHECKED D M M <br /> WCO WALL CLEANOUT 5. THE INSTALLATION OF AN ELECTRIC WALL HEATER WITHW THE NEW COACH'S OFFICE. <br /> WH WATER HEATER <br /> DATE 06-07-2017 <br /> W/O WITHOUT <br /> WSEC WASHINGTON STATE ENERGY CODE <br /> GENERAL NOTES, <br /> SCHEDULES & <br /> DFtAWING LIST <br /> � <br /> � <br /> � <br /> Q <br /> Z <br /> � <br /> o • <br /> N <br /> ' � <br />