Laserfiche WebLink
REVISIONS <br /> SECTION 22 10 05 components. Gasket material similar to coupling gasket materiai noted above. 8. Where more than one piping run can be installed in parallel and at same elevation, provide 3.01 PREPARATION <br /> • DOMESTIC WATER PIPING 5. Dimensions and Testing: In accordance with AWWA C606. multiple or trapeze hangers. <br /> PART 1 GENERAL C. Ream pipe and tube ends. Remove burrs. <br /> 6. Housing Material: Ductile iron conforming to ASTM A-536, grade 65-45-12. 9. Provide copper-plated hangers and supports for un-insulated copper tubing. Pipe-tight hangers <br /> are acceptable oniy for piping conveying fluids at ambient temperatures. All Hot Water, Hot Water D. Remove scale and dirt, on inside and outside, before assembly. <br /> 1.01 SECTION INCLUDES 7. Housing Coating: Copper-colored alkyd enameL Circulatin Cold Water, is to be insulated. E. Kee o en ends of i e free from scale and dirt, rotect o en ends with tem ora lu s or ca s. <br /> g� P p P P p P p rY p 9 p � <br /> A. Water Piping, Above Grade 8. Gasket Material: Grade EHP or EP, UL classified in accordance with ANSI/NSF 61 for cold <br /> 10. Provide hangers adjacent motor-driven equipment with vibration isolation. F. After completion, fill, clean and flush system. � <br /> B. Flanges, Unions, and Couplings +86°F/+30°C and hot +180°F/+82°C potable water service. z <br /> 11. Auxiliary Steel: All auxiliary steel necessary for the installation of the pipe hangers and 3.02 INSTALLATION W <br /> C. Pipe Hangers and Supports 9. Bolts and Nuts: Hot dipped galvanized. supports shall be designed in accordance with the AISC Steel Handbook, and shall be furnished <br /> D. Gate Valves 10. When pipe is field grooved, provide coupling manufacturer's grooving tools if required by and installed by this Contractor. A. Install in accordance with manufacturer's instructions. � <br /> E. Ball Valves manufacturer's warranty. 12. All steel rods, hangers and brackets, shall be electro-plated. Custom fabricated steel B� Route piping in orderly manner and maintain gradient. Route parallel and perpendicular to walls. � <br /> C. Dielectric Connections brackets or hangers shall receive one shop coat primer paint by this Contractor. C. Group piping whenever practical at common elevations. U <br /> 1.03 REFERENCE STANDARDS 1. Manufacturers: 3.03 APPLICATION D. Install piping to allow for expansion and contraction without stressing pipe, or joints. O <br /> A. ASME B16.18 - Cast Copper Alloy Solder Joint Pressure Fittings; The American Society of a. Victaulic A. Use grooved mechanical couplings and fasteners only in accessible locations. E. Provide clearance in hangers and from structure and other equipment for installation of insulation � <br /> Mechanical Engineers; (ANSI B16.18). b. Gruvlok B. Provide unions downstream of valves and at equipment or apparatus connections. and access to valves and fittings. z <br /> B. ASME B16.22 -Wrought Copper and Copper Allo Solder Joint Pressure Fittings; The American C. Provide ate or ball valves for shut-off and to isolate e ui ment, arts of s stems, or vertical risers. F. Install bell and spigot pipe with bell end upstream. � <br /> c. Approved equal 9 q p p y � <br /> Society of Mechanical Engineers. D. Provide isolation valves with ositive shutoff for domestic hot water, cold water and hot water G. Provide sound lagging on all above-ground plastic (ABS, PVC, CPVC, etc.) waste and vent piping. <br /> 2. Provide dielectric waterway fittings that maintain external electrical continuity while maintaining p U <br /> C. ASME B16.51 Copper and Copper Press-Connect Pressu � s internal isolation. Fittings shall comply with ASTM F 492, and be listed by IAPMO. For pipe sizes recirculation at restrooms. Isolation valves shall be located above T-bar ceiling in area adjacent H. Installation of ABS Piping: � <br /> D. ASME B31.9 - Building Services Piping; The American Society o nical Engineers; 2" and less used dielectric nipples and for pipe sizes 2-1/2" and larger use dielectric flange kits. restrooms where possible. If located above a hard ceiling, provide access panel. <br /> 1. Install per Uniform Plumbing Code, including Installation St rds IAPMO IS 1-2006 and � <br /> (ANSI/ASME B31.9). Do not use dielectric unions. E. Connect hot water circulating piping to hot water piping within 24" of plumbing fixtures. Bring IS-5-2006. Provide trench width of the pipe O.D. plus 16" ; ipe O.D. times 1.25 plus 12". � <br /> E. ASTM B32 - Standard Specification for Solder Metal. 2.03 PIPE HANGERS AND SUPPORTS circulating piping down into wall as needed to meet this distance requirement. Compact backfill in 6" maximum layers, by hand, as ired by ASTM D2321.Support � <br /> A. Provide han ers and su p y horizontally at every 4', and provide mid-story gu' �to maintain alignment of vertical piping. z <br /> F. ASTM B42 - Standard Specification for Seamless Copper Pipe, Standard Sizes. 9 pports that com I with ASME B31.9, MSS SP-58 & SP-69. 3.04 TOLERANCES � <br /> A. Water Pi in Slo e at minimum of 1/32" Provide supports at base. Q <br /> G. ASTM B75 - Standard Specification for Seamless Copper Tube. . 1. If type of hanger or support for a particular situation is not indicated, select appropriate type using P� 9� p per foot, and arrange to drain at low points. �� <br /> �� MSS SP-58 & SP-69 recommendations, see Section 22 00 20. 3.05 DISINFECTION OF DOMESTIC WATER PIPING SYSTEM 2. Allow for expansion every 30' horizonta : d vertically. U <br /> H. ASTM B88 - Standard Specification for Seamless Copper Water Tube. � 3. Provide sound lagging on all abov �,ound ABS piping; reference Section 22 07 19. <br /> ��� 2. Overhead Supports: Individual steel rod hangers attached to structure or to trapeze hangers. A. Prior to starting work, verify system is complete, flushed, and clean. � <br /> I. ASTM F 493: Solvent Cements for CPVC Pipe and Fittings 3.03 ERECTION TOLERANCES �� <br /> �r 3. Supports for roof mounted pipe, for flat roof applications, see Section 22 00 20 B. Inject disinfectant (free chlorine in liquid, powder, tablet or gas form) throughout system to obtain 50 � <br /> J. ASTM D 1784: Rigid Vinyf Compounds ` to 80 m /L residual. A. Draina e Pi in Establi �rt elevations within 1/2" verticall of location indicated and slo e to <br /> B. " bing Piping - Water: g o drain at min m m of ,per foot slope. y p <br /> K. ASTM D 1785: PVC Plastic Pipe, Schedule 40 1. Co to ASME B31.9. C. Bleed water from outlets to ensure distribution, and test for disinfectant residual at minimum of 15/o �� � � <br /> ��� <br /> L. ASTM D 2466: PVC Plastic Fittings, Schedule 40 `�- of outlets. 3.04 TESTING ��,y..� <br /> 2. Hangers'° ipe Sizes 1/2" to 2": Carbon steel, adjustable swivel, split ring. �, �' <br /> M. ASTM D 2564: Solvent Cements for PVC Pipe and Fittings `� �, D. Leave disinfectant in system for 24 hours. A. Test th�.� ainage Systems as required by Jocal Authority Having Jurisdiction. <br /> 3. Adjustable si� am clamps MSS-SP69-Type 25 or approved equaL --�'}-�"" <br /> N. AWS A5.8 - Specification for Filler Metals for Brazing and Braze Welding; American Welding �',`,,� E. If final disinfectant residual tests less than 25 mg/L, repeat treatment. ,.-�''-!�--� <br /> Society. 4. Multiple or Trapez� ,�ers: Steel channels with welded supports or spacers and hanger rods. ,���� <br /> F. Flush disinfectant from system until residual is equal to that of incoming water or 1.0 mg/L �,,-�'''� SECTION 22 13 19 <br /> O. MSS SP-58 - Pi e Han ers and Su 5. Vertical Support. Steel ��,:clamp. f�� SANITARY & STORM PIPING SPECIALTIES <br /> p g pports - Materials, Design, Manufacture, Selection, Application, ����� G. Take samples no sooner than 24 hours after flushing, from 10°/o of outlets and from water point of �''� <br /> and Instal�ation; Manufacturers Standardization Societ of the Valve and Fittin s Indust Inc. 6. Co er Tube Su '"' <br /> y g ry, pp pport: Carb ��el ring, adjustable, copper plated. entry; analyze in accordance with AVWVA C651. �-� PART 1 GENERAL <br /> P. MSS SP-69 � Pipe Hangers �nd Supports - Selection and Application; Manufacturers 7. Hanger Rods: Mild steel threaded b� ends, threaded one end, or continuous threaded, zinc � �� 1.01 SECTION INCLUDES <br /> � H. Provide copies of certified test reports from the Health Department to the Owners Com�sioning ������. <br /> Standardization Society of the Valve and Fittings Industry, Inc. plated. ���_�� Agent, Owner's representative, and General Contractor prior to occupancy. � �''���" A. Floor Drains � <br /> Q. MSS SP-89 - Pipe Hangers and Supports - Fabrication and Installation Practices; Manufacturers 8. All hanger materials to be zinc or cadmium pl` � ��� �r��� �� ����� �`� <br /> ��� 3.06 TESTING r�� ,�' B. Cleanouts Y� ��`� � �.'':�> ��� <br /> Standardization Society of the Valve and Fittings Industry, Inc. , ``��� ,, �� �� ����~, � �� <br /> 9. Isolate all pipe work within the first 50 of vibratior�C ted equipment or within the mechanical A. Test Domestic Water a minimum of 100 PSI or 1-1/2 times incomin <br /> s aces whichever is �4 g p�: �sure whichever is greater 1.02 RELATED SECTIONS <br /> R. MSS SP-110 - Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends; p , greater. ��,.�� and hold pressure for two hours without loss of pressure. Have th�`st witnessed by the �7� :� , <br /> Manufacturers Standardization Societ of the Valve and Fittin s Indust Inc. �'�- ' .�~-��-. A. Section 22 10 05 - Plumbing Piping. �_� <br /> y g ry� 10. Provide roller hangers for all applications where ther � ovement causes han er rods to Commissioning Agent and the Owner's representative. If the � �I,�ing is phased, provide multiple r � , � <br /> '� �. g ��� ����:� � <br /> S. NSF Standard 14: Plastic Pi m Com onents & Related Materials deviate more than 4 de rees from vertical or lon itudinal move' , t exceeds 1/2". Provide tests as needed. Do not over pressurize the system if ther��s=PEX tubing in the s stem. B. Section 22 40 00 - Plumbing Fixtures. � � ���ry � � <br /> p� 9 p 9 9� �� � Y z����,� ������ ; <br /> protection saddles for use with roller hanger. �'���� ��� 1.03 REFERENCES �������-��' � <br /> T. NSF 61 & NSF 372 Drinking water system components and drinking water systems components - �,� �;;�� �„ <br /> �"�`'� �� A. ASME A112.6.3 - Floor and Trench Drains; The American Society of Mechanical Engineers. <br /> lead content. 11. All auxiliary steel necessary for the installation of the pipe hanger�, ,►�d supports shall be � ��,� <br /> designed in accordance with the AISC Steel Handbook and furnished by f� echanical =� <br /> U. NSF 61-G Annex G Lead Free Designation ��� SE,C�ION 22 13 16 B. Reference standards shall be the latest revision as accepted by the local Authority Having <br /> . Contractor and shall have one coat of primer paint prior to or after installation'�.�,� ,�,���� <br /> �`�� SANITARY WA�TE VENT AND STORM PIPING Jurisdiction. <br /> V. All codes and standards shall be latest version as accepted by the local Authority Having ��.�- , , <br /> 12. It shall be the res onsibilit of the Mechanical Contractor to rovide an ade i e `�` <br /> P Y P q� ;�p �-. <br /> Jurisdiction. suspension system in accordance with recognized engineering practices, using standa ��� PART 1 GENERAL K� �,j� 1.04 SUBMITTALS <br /> �l�` 1.01 SECTION INCLUDES � A. Product Data: Provide com onent sizes, rou h-in re uirements, service sizes, and finishes. <br /> 1.04 SUBMITTALS commercially-accepted pipe hangers and accessories: ��� ��,q,- p g q <br /> A. Product Data: Provide data on all materials, tubing, tube fittings, valves, and accessories. Provide 2.04 VALVES ����,� ,;�'�� B. Manufacturer's Instructions: Indicate Manufacturer's Installation Instructions: Indicate assembly and <br /> , `�;_�ti� A. Pipe, pipe fittings, and�connections for piping systems <br /> manufacturer s catalog information. Indicate valve data and ratings. �� .� su ort re uirements. <br /> A. Manufacturers: `''���_ -����° pp a � <br /> �� Sanitary Sewer��iping, Buried to 5' Outside of Building <br /> �. Sho Drawin s: Provide drawin s coverin all s eciall -desi ned han er assemblies and �`� � C. Operation Data: Indicate frequency of treatment required for interceptors. � <br /> p g g g p y g g 1. Armstrong �:�'�� �'� <br /> , fabrications. Also provide drawings showing assemblies of standard manufactured hangers based ����nges,.�Jnions, and Couplings D. Maintenance Data: Include installation instructions, spare parts lists, exploded assembly views. � <br /> upon this particular project's requirements. 2. Apollo `����� �".�°�'` <br /> 1.03 R� , ENCES 1.05 QUALITY ASSURANCE z <br /> C. Project Record Documents: Record actual locations of valves, buried piping, and any other changes 3. Asco ,��3��;.�,�, <br /> A,�ASM �1�9 - Building Services Piping;The American Society of Mechanical Engineers; O <br /> made to contract drawings. 4. A roved E uaL ,��`�' ���" � A. Perform work in accordance with applicable codes. <br /> pp q ,��� (ANSI/AS � 31.9). <br /> D. Mechanical Contractor to submit sketches coverin all han ers ro osed for use on this ro'ect. � ���;- B. Li ht commercial drains and cleanouts are not acce table. If found on this ro ect the will be � <br /> 9 9 P P p J B. Gate Valves '�' ^ B. ASTM A 74 S� rt€�ard Specification for Cast Iron Soil Pipe and Fittings. removed and replaced by the Mechanical Contractor�, at no cost to the Ow er, y � <br /> Manufacturer's data shall also be submitted. l,,�� ��� <br /> 1. Up To and Including 2 . � C. ASTM C 564 - Star�i ,-� Specification for Rubber Gaskets for Cast Iron Soil Pipe and Fittings. 1.06 DELIVERY STORAGE AND PROTECTION Q <br /> 1.05 QUALITY ASSURANCE �� ��;:��,,� � , N <br /> a. MSS SP-80, Class 150, bronze body, bronze trim, rising stem, handwheel, union bo; et inside D. ASTM A888 - Standar��' ification for Hubless Cast Iron Soil Pipe and Fittings for Sanitary and A. Accept specialties on site in original factory packa in Ins ect for dama e. <br /> A. Perform work in accordance with applicable codes. �.,;� ���� g� g� p g � <br /> screw, solid wedge disc, solder or threaded ends. �f,�; Storm Drain, Waste, and e��� �ping Applications <br /> B. Valves: Manufacturer's name and pressure rating marked on valve body. ,� � �,���� PART 2 PRODUCTS z <br /> C. Ball Valves � E. CISPI 301 - Standard S ecificaf� f r Hubless Cast Iron Soil Pi e and Fittin s for Sanita and <br /> C. All domestic water i in and valves in contact with otable water shall be certified lead free less �� �-`�` p ��� p g ry 2.01 FLOOR DRAINS � <br /> p p g p � 1. 2 and Smaller: ,,� Storm Drain, Waste and Vent Pipin ` " ��lications; Cast Iron Soil Pipe lnstitute. W <br /> than 1/4 of 1%). Any product designed for dispensing potable water must meet both the NSF 61 and ��,� A. Manufacturers: <br /> a. MSS SP-110 150 si SWP, 600 , �� F. CISPI 310 - Specification for Coupling f t�s�e in Connection with Hubless Cast Iron Soil Pipe and " <br /> NSF 372 test standards, or be NSF-61-G certified to all requirements of NSF/ANSI 61 (health , p 9 psig CWP bronze, two-piece bo�, Fy�chrome-plated brass ball, ��� <br /> �� Fittin s for Sanita and Storm Drain, Was �'`� 1. Ja R. Smith <br /> effects) and all requirements of Annex G and NSF/ANSI 372 (lead content) via third-party testing full port, teflon seats and stuffing box ring, blow-out-proof stem .1�` er handle, with solder, g rY s��d Vent Piping Applications; Cast Iron Soil Pipe y � <br /> threaded, or rooved ends; provide stem extension to allow o ,e tion without interFering with Institute. ���;� 2. Wade, Inc. O <br /> and certification. J <br /> pipe insulation. .� � ' G. ASTM D 3965 Ri id ABS Com ounds �'��� <br /> D. Do not solder within 12" of valves manufactured from any bismuth alloy. rf;,�� g p ��a� 3. Zurn industries, Inc. � <br /> PART 3 EXECUTION f���' H. ASTM F 628 Co-extruded ABS Pipe with Cellular Co��"�� B. Floor Drain (FD-1): <br /> 1.06 DELNERY, STORAGE, AND HANDLING ,� ��, J <br /> 3,01 PREPARATION �`� I. ASTM D 2661 ABS Drain, Waste, and Vent Fittin s �� 1. ASME A112.6.3; alvanized cast iron two iece bod with draina e flan e wee holes reversible <br /> A. Accept products on site in shipping containers with labeling in place. Inspect for damage. r� g �� 9 p y g g ' p ' O <br /> A. Ream pipe and tube ends. Remove burrs. � s� clamping collar, trap primer connection, vandal-proof screws, and square, adjustable <br /> B. Protect piping systems from entry of foreign materials by providing temporary covers, completing ,� ` J. ASTM D 2235 Solvent Cements for ABS Pipe and Fittings '���� <br /> B. Remove scale and dirt on inside and outside b ;ore assembl �'�s� nickel-bronze strainer. <br /> sections of the work, and isolating parts of completed system. ,.� y� K. NSF Standard 14 Plastic Piping Components and Related Matenals ��� <br /> C. Prepare piping connections to equipment �h�nges or unions. �`sY�� 2.02 CLEANOUTS = <br /> C. Plastic Pipe �� L. Reference standards shall be the latest revision as accepted by the locaf��i��ority Having <br /> � � � ��� A. Manufacturers: <br /> 1. Read the manufacturer's installation instructions. D. Keep open ends of pipe free from sc�l and dirt; protect open ends with temporary plugs or caps. Jurisdiction. '�\_�,�� V <br /> �f`�� � � 1. Ja R. Smith <br /> 2. Kee i e and fittin s in ori inal acka in until needed. E. After completion, fill clean and dis " fect system. 1.04 SUBMITTALS �;'� <br /> �� Y <br /> ���, <br /> ppp 9 9 p 9 9 ' �, - �j W <br /> 3.021NSTALLATION �X�` ��� 2. Zurn Industries, Inc. <br /> 3. Cover i e and fittin s with an o a ue tar if stored outdoors. ,�- A. Product Data: Provide data on pipe materials, pipe fittings, valves, and accessones � vide <br /> p p g p a p manufacturer's catalo information. Indicate valve data and ratin s. �`�? 3. Wade, Inc. � J � <br /> A. Install in accordance with �"nufacturer's instructions. 9 g ��, <br /> 4. Inspect pipe for damage prior to use. f�;�� ��� � o <br /> B. Lead type solders are ot allowed on the jobsite. B. Provide sketches covering all specially designed hanger assemblies and fabrications. Also p q de B. Cleanouts at Interior Finished Floor Areas (FCO): � �o <br /> 5. Use tools specifically designed for use with plastic pipe. �� � . ��,a� _- o� <br /> ���� sketches showin g assemblies of standard manufactured han gers based on this particular pr o� `�: 1. L a c u e r e d c a s t i r o n b o d w i t h a n c h o r f l a n e, t hrea de d to assem b l an d roun d scoria te d � � Q <br /> C. Use on ly wa ter so I�le pas te f lux designe d to wor k with lead free solders. �;�§* a Y 9 p Y, U� � <br /> PART 2 PRODUCTS � re uirements. �� � <br /> j�,�� a ��� secured nickel bronze cover in a round depressed frame, with ABS tapered threaded plug. <br /> D. Do not solder yv thin 12" of valves, flan es, etc., manufactured from an bismuth allo . ���; � � <br /> 2.01 WATER PIPING, ABOVE GRADE �,�.� 9 Y Y 1.05 QUALITY ASSURANCE �;�� ., 2. Cleanouts at Interior Finished Floor Areas for Carpeted Floors: � � W <br /> E. Provide no conducting dielectric waterway connections wherever jointing dissimilar metals. A. Perform work in accordance with a licable codes. ��' � w <br /> A. Copper Tube: ASTM B 88 (ASTM B 88M), Type L (B), Hard Drawn. � a. Where cleanout is installed in car eted areas, rovide nickel bronze car et clam frame. � _ <br /> .� � PP ��..: <br /> Dielectnc,nions are not allowed. � p p p p w <br /> 1. Fittings: ASME B16.18, cast copper alloy or ASME �16.22, wrought copper and bronze. ���" g y 1.06 DELIVERY, STORAGE, AND PROTECTION ~��°�� . MC to coordinate carpet clamp rings or correct after carpet installation. a' � ¢ <br /> F. Rout�;-pipin in orderl manner and maintain gradient. Route parallel and perpendicular to walls. ``��,R, � � � <br /> 2. Joints. ,� A. Accept products on-site in shipping containers with,labeling in place. Inspect for damage. 3`�e nouts at Interior Finished Floor Areas for Tile Floors: � z <br /> G. �up piping whenever practical at common elevations. � � � <br /> a. ASTM B 32, lead-free solder. f�=�� B. Protect piping systems from entry of foreign materials by temporary covers, completing sections of a. ���`�r cleanout is installed in tiled areas rovide nickel bronze to with 1/8" tile recess cover� <br /> H:=° nstall piping to allow for expansion and contraction without stressing pipe,joints, or connected the work, and isolatin arts of com leted s stem. , - - �'� ' p p , LL� O � <br /> b. Extracted collars approved for pipe sizes 1/2" to 2". Forjoints made with a T-Drill mechanical ��" �equipment. g p • p y obtar`�'t�� piece to insert into cover. �. � .- <br /> extractor, follow manufacturer s o eratin instructions. `^ <br /> ��� � N <br /> p 9 �". PART 2 PRODUCTS C. Cleanouts at t �r Finished Wall Areas (WCO): <br /> �N� I. Provide access where valves and fittings are not exposed minimum size 12" x 12". �,� <br /> c. Press-Seal Fitting, approved for pipe sizes 1/2" to 4". � ' 2.01 MANUFACTURERS �- <br /> ��`�`` 1. Line type w�th ��� uered cast iron body and ABS tapered thread plug, and round smooth stainless � <br /> 1) Manufacturers ��� J. Install valves with stems upright or horizontal, not inverted. � <br /> � A. AB&I steel access c� �,� cured with stainless steel machine screws. z <br /> �. K. Install water piping to ASME B31.9. �,�X� - <br /> a)Viega, ,�� <br /> � B. Charlotte D. Provide cleanouts at e�: ���air of 45-degree elbows. At each 90-degree turn, and at each 50' of �, o <br /> L. Copper Tube Extracted Joints may be used on copper tubin Dim le branch connection to control � �� "' <br /> b Nibco Press S stem .`; r g� p strai ht run. �� � W <br /> � Y insertion�. Brazed �oints onl C. Tyler �g '��� w �� <br /> c)Approved equal j� � y� , E. Cleanouts shall be line size��`�,� and including 3" piping, and 4" for piping 4" and larger. z ��a e <br /> M. Tube Press Fit Joints shall be installed in accordance with the manufacturer s mstallation 2•02 SANITARY SEWER PIPING, BURIED TO 5 OUTSIDE OF BUILDING ,,\.,�_ _ W�o � <br /> 2)Fittin gs shall be manufactured with an inboard bead desi gn havin g com pressi q crim p P A R T 3 E X E C U T I O N �A, <br /> � �°� 3 <br /> �� i n s t r u c t i o n s. T h e t u b i n g s h a l l b e f u l l y i n s e rt e d i n t o t he f i t ting an d t he tu bing mar ke d a t t he s hou l der o f A. Cast Iron Pipe: CISPI 301 and ASTM A888, hubless. �;r`_ z o�^ � <br /> applied on both upstream and downstream sides of EPDM elastomeric seal ad and 3.01 INSTALLATION � w Z _�.. <br /> „ ��� the fitting. The fitting alignment shall be checked after pressing against the mark on the tubing to �-�ti N a�, . <br /> un-pres s e d f i t t i n g l e a k i d e n t i�c a t i o n f e a t u r e. 2-1/2 t h r u 4" s h a l l h a v e a 4 2 -� �tain less s tee l 1. Fi ttin s: Iron. �\�.ti . ��N <br /> � assure the tubing is fully inserted into the fitting. The joints shall be pressed using only the tool g A. Install in accordance with manufacture � _° � <br /> grip ring, PBT separator ring, and EPDM sealing element. �`s � ,�structions. � �� <br /> ��� approved by the manufacturer. 2. Joints: CISPI 31 0, n e op r e n e g a s k e t o r s t a i n l e s s s t e e l c l a mp a n d s h i e l d assemblies conforming to ���.�,.�,a, W °� <br /> d. Mechanical Cou lin s: See ara ra h "Flan es, Unions and Cou lin s";`� B. MC to coordinate the hei ht of floor drain E the GC. � N <br /> p g p g p g p 9 � N. C o p p e r T u b e R o l l e d G r o o v e j o i n t s s h a l l b e i n s t a l l e d i n a c c o r d a n c e w i t h m a n u f a c t u r e r's i n s truc tions. ASTM C1277. g � ��� � N <br /> � C. Extend cleanouts to finished floor or wall su � W <br /> .�,�' O. P r o v i d e s l eeves for pipes passing t hroug h pa r ti tions, wa l ls an d f loors. Use commercially a. M a n u f a c t u r e r s �.�� <br /> 2.02 FLANGES, UNIONS, AND COUPLINGS r� manufactured modular seals for sleeves passing through floors, below-grade walls and floor slabs 1) Clamp-All Hi -Torq 125 D. Ensure adequate clearance at Floor Cleanouts �����loor Drains for rodding of drainage system; 18" � <br /> A. Unions for Pipe Sizes 2" and Under: below grade. Make these penetrations water-tight against ground water pressure. minimum require d. ��_ <br /> 2 A roved e ual; must be listed for under round a lication. ��'� <br /> '� � pp a g pp E. Install floor cleanouts at elevation to accommodate fm ��c�d floor. Mechanical Contractor to <br /> 1. Co er tube: Class 150 bronze unions with soldered 'oints. '' P. Pipe Han ers and Su 3. Pipe and fittings shall be marked with the collective trademark of the Cast Iron Soil Pipe Institute coordinate with floor finisher for a smooth finished floor.��� <br /> pP � 9 pports: <br /> B. Mechanical Couplings for Grooved and Shouldered Joints �`� 1. It shall be the responsibility of the Contractor to provide an adequate pipe suspension system in ���A'� <br /> j, B. ABS Schedule 40 Pipe and DVW Fitting System: ��y� <br /> 1. Manufacturers: �`" accordance with recognized engineering practices, using standard commercially-accepted pipe � \�� <br /> ,� hangers and accessories. 1. Pipe and fittings shall be manufactured from ABS compound with a cell class of 42222 for pipe .��� /� R C IH I T E C T U R E <br /> a. Vic tau lic � 2. Install in accordance with A S M E B 3 1.9 a n d M S S S P-8 9. and 32222 for fittings as per ASTM D 3965 and conform with National Sanitation Foundation \'����, nacarc riitecture.com <br /> 2025 FIR�TAVENUE <br /> ��f (NSF) Standard 14. Pipe shall be iron pipe size (IPS) conforming to ASTM F 628 and ASTM D \���� � � SUITE 300 <br /> b. Gruvlok �;� SEATTLE WA98121 <br /> ��, 3. Use only adjustable side beam clamps (Type 25); standard beam clamps are not acceptable. 2751. Fittings shall conform to ASTM D 2661 for solid wall piping. ��,y P206.441.4522 <br /> � \l'�'�K....... <br /> c. Approved equal f 4. Inserts and shields are to be laced at each han er b the i m contractor. Reference Section 2. All i e and fittin s are to be roduced b a sin le manufacturer and to be installed in accordance ��;, <br /> � ���' p 9 Y p P� 9 p p 9 p Y 9 ,�r � � � <br /> � � � � 2. Two or more curved housing�segments with conti� �ous key to engage pipe groove, circular 22 00 20. � � with manufacturer's recommendations and local code requirements. � ����$ � � � rvac rvo 121-16027 � <br /> C-profile gasket, and bolts to secure and compr `'s gasket. �� <br /> 5. Install hangers to provide a minimum of 1/2" space between finished covering and adjacent work. 3. Solvent cement shall conform to ASTM D 2235. The system is intended for non-pressure drainage \��� ��WN RSH <br /> 3. Grooved mechanical couplings. 200 psi mini m joint working pressure, cast ductile iron housing 6. Place hangers within 12" of each horizontal elbow. applications where the temperature will not exceed 140°F. �`,1�; cHECKEo DMM <br /> conforming with ASTM A-536. Gaskets for d " " estic water service, EPDM per ASTM D-2000. ��� <br /> 4. Install per Uniform Plumbing Code, including Installation Standards IAPMO IS 1-2006 and e�� <br /> 7. Use hangers with 1-1/2" minimum vertical adjustment. Design hangers for pipe movement � �� oATE 06-07-2017 <br /> 4. G r o o v e d m e c h a n i c a l f l a n g e a d a p t e r s s h a l l �.e d u c t i l e i r o n (A S T M A-5 3 6), e n g a g i n g d i r e c t l y i n t o r o l l I S-5-2 0 0 6. �� <br /> without disen a ement of su ,,, <br /> g g pported pipe. ��0., <br /> grooved copper tube and fittings and bol �";g directly into ANSI Class 150 steel flanged 5. Never test with or transport/store compressed air or gas in ABS pipe or fittings. `�,,• <br /> \ : <br /> �, .� <br /> , <br /> PART 3 EXECUTION `�� <br /> � � � � � ���: <br /> ,_ <br /> �� <br /> �M,' MECHANICAL <br /> ��� SPECIFICATIONS <br /> ,�.. <br /> ��,�. <br /> ,'<,..� <br /> " � <br /> � <br /> � <br /> Q <br /> Z <br /> � <br /> o • <br /> 0 <br />