Laserfiche WebLink
. <br /> c. As-builts, easement, and one-year Warrantee Bond in the amount of 1096 of <br /> the cost of construction of the public water system are required within 10 <br /> working days of obtaining public water connection. <br /> d. City streets are to be kept clear of dirt and debris during construction. <br /> e. During construction, all truck traffic to and from the site within the City <br /> of Everett shall be on arterial streets unless otherwise approved by the <br /> Public Works Department. <br /> 6. Sewer Service <br /> Sewer service is available through a 10" main on Rainier Drive. The approximate <br /> sewer connection fee based on the preliminary information provided is $.0891/ft. <br /> The actual cost shall be computed by the Building Department per the ordinance <br /> in effect at the time and according to the information provided on the approved <br /> plans on the date of permit issuance. Sewer connection has to be paid prior to <br /> permit issuance. <br /> 7. Drainage <br /> On-site detention is required. Drainage calculations to be submitted on City <br /> Drainage Plan submission form. Reseeding of exposed earth is required within 30 <br /> days of completion of earth work. A temporary erosion control plan must be <br /> approved by the Public Works Department prior to the issuance of any permits. <br /> A Local Improvement District covenant will be required for participation in the <br /> cost of drainage improvements on Rainier Drive or Evergreen Way as <br /> recommended in the Pigeon Creek #1 Drainage Basin Plan. <br /> 8. Civil Engineering <br /> A preconstruction conference on Civil Engineering portion of project is required <br /> prior to approval of Public Works Permit. The Applicant shall arrange meeting <br /> ' involving Applicant, job superintendent, contractor, all subcontractors, Fire <br /> Marshal, Planning Department Coordinator, Building Department Coordinator, <br /> Public Works Coordinator, Public Works Inspector, and City Traffic Engineer. <br /> 9. Water Service <br /> For water service, a 6" line must be extended form the intersection of Lake <br /> Street and Rainier Drive. <br /> 10. Street Improvements <br /> Full street improvements as required by Ordinance ##555-78 as amended by Ord. <br /> No. 665-80 to be completed on Rainier Drive at the time of construction. <br /> 111. Legal Requirements <br /> The Owners and their successors and assigns shall comply with all city, state and <br /> federal laws, rules and regulations applicable to the development, sale and <br /> ! . maintenance of the subject property. <br /> 12. Recording <br /> This agreement shall be filed in the records of the Snohomish County Auditor for <br /> the purpose of subjecting the subject property to the restrictions, conditions and <br /> limitations herein set forth which are intended and shall have the force and <br /> effect of deed restrictions and shall be deemed to be covenants running with the <br /> land and binding upon the Owners, their successors and assigns. <br /> 13. Enforcement <br /> Any violation of this agreement by the Owners or their successors or assigns shall <br /> be considered a violation of the zoning ordinance of the City of Everett and shall <br /> be subject to all applicable penalties. In addition to said remedies, the City may <br /> also elect to bring such action or actions as will accomplish specific performance <br /> of this agreement. <br />