| f .     Program  763   -  Traffic  Signal   Control   System  Purchase
<br />   						for  the  Evergreen  Way/SR  526  Ramps/Casino  Road  inter
<br />   						sections
<br />   						1 )    Appropriation  							70, 000
<br />   						2 )     Source  of  Funds
<br />  											FAM       		14 , 756
<br />  											WSDOT  Dist  #1   47 , 500
<br />  											1 /2¢  Gas  Tax    29 , 244
<br />																		91 , 500
<br />   					g .     These  appropriations  shall   not  lapse ,   but  shall   be
<br />   						carried   forward  from  year  to  year  until   fully  expended
<br />   						or  the  purpose  has   been  accomplished  or  abandoned
<br />   						without  necessity  of  reappropriation  as   per  R.C.W. ,35.33.151 .
<br />  				ARE  HEREBY  AMENDED  AS   FOLLOWS :
<br />       				SECTION  3 :
<br />      				The  total   estimated  cost  of  the   improvement   herein   is   $743 , 715
<br />      				which  shall   include  all   cost  of  the  design ,   plans ,   speci -
<br />       				fications ,   construction  and  associated  costs .
<br />       				SECTION  6 :
<br />      				The  additional   sum  of  $473 , 070  bringing  the  total   to  $743 , 715
<br />   				be  appropriated  to   Fund   328  Evergreen  Way  Signals ,   et  al ,   for
<br />  				the   purposes  of  performing  preliminary  engineering ,   purchase  of
<br />  				traffic  control   system  hardware ,   and   upgrading  existing  traffic
<br />   				signals   (mast  arms ,   poles ,   opticom  system ,   controller ,   signal
<br />   				indications )  at  47th/Evergreen  Way,   50th  Evergreen  Way,   52nd/
<br />   				Evergreen  Way,   Pecks/Evergreen  Way ,   Madison/Evergreen  Way,
<br />  				79th/Evergreen  Way.
<br />   					a .     Program  716  -  Traffic  Signal   Reconstruction  on   Evergreen
<br />   						Way  at  47th  Street ,   50th  Street ,   52nd  Street
<br />   						1 )    Appropriation							335 , 581
<br />   						2 )     Source  of  Funds
<br />  											FAM       		244 ,405  (221 ,520 additional )
<br />  											1 /2¢  Gas  Tax      91 , 1 76  (45,436 additional )
<br />      																	335 , 581
<br />   					b .     Program  722   -  Traffic  Signals  on  41st  Street  at  Colby
<br />   						&  Rucker
<br />   						1 )     Appropriation  							19, 583
<br />   						2 )     Source  of  Funds
<br />  											FAM 			16, 054
<br />  											1 /2¢  Gas  Tax 	3 , 529
<br />																		1 9, 583
<br />   					c .     Program  723  -  Traffic  Signals  at  37th  Street/Colby  &
<br />   						35th/Rucker
<br />   						1 )     Appropriation  							14 ,457
<br />   						2 )     Source  of  Funds
<br />  											FAM 			11 , 566
<br />  											1 /2¢  Gas  Tax 	2 ,891
<br />																		14 , 457
<br />   					d .     Program  724  -  Traffic  Signals  on  Evergreen  Way  at  Pecks
<br />   						Drive,   Madison  Street ,   79  Street ,   and   Evergreen  Way
<br />   						(47  to  49 )   interconnect
<br />   						1 )    Appropriation							276 , 594
<br />   						2 )     Source  of  Funds
<br />  											FAM       		1 96, 233  (171 ,033  additional )
<br />  											1 /2¢  Gas  Tax      80 , 361  (35,081  additional )
<br />      																	276 , 594
<br />											-2-
<br /> |