T Bailey Inc. 6/20/2018 Change Order 2
>
Contracts
>
Capital Contract
>
T Bailey Inc. 6/20/2018 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2018 9:39:25 AM
Creation date
7/11/2018 9:39:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc.
Approval Date
6/20/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0000873
Total Compensation
$7,889.46
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: WFP East Clearwell Roof Replacement <br /> Change Order No.02 <br /> Change Order Effective Date: 6/15/18 <br /> CONTRACTOR <br /> By Date: 04 <br /> �9►,n 4,,,AA5,AP0fficer <br /> Exhibit A - Description of Changed Work <br /> Work Change Directive—No. 007 Remove Existing Asphalt: WCD-007 is a lump <br /> sum revision for $3,889.46. WCD-007 added one calendar day. <br /> Justification: The scope of the project included removal and replacement of the Screen <br /> House Bridge. The existing bridge that was removed, sat at an elevation that was <br /> approximately 2-inches higher than the surrounding area. To transition from the ground <br /> to the bridge an asphalt approach had been installed. The new bridge that was installed <br /> sat an elevation that matched the surrounding area. The asphalt approach was now a trip <br /> hazard. <br /> WCD-007 covers the additional costs to break up, load, haul and dispose of the asphalt. <br /> WCD-007 also covers the additional costs to place and grade crushed rock in the area <br /> where the asphalt was removed. <br /> Work Change Directive—No. 008 Provide and Install Ladder: WCD-008 is a lump <br /> sum revision for $4,000.00. WCD-008 added one calendar day. <br /> Justification: During the design submittal review process, the hatch locations and sizes <br /> were revised. The 24" x 24" sample hatch, located in the northeast corner of the <br /> clearwell, was revised to a 36" x 36" access hatch. WCD-008 adds a ladder for the <br /> access hatch. <br /> Contract Time: <br /> Fourteen Calendar Days are being added to the contract by this change order. One <br /> calendar day for WCD-007, one calendar day for WCD-008 and 12-calendar days for <br /> the following reasons. <br /> WFP East Clearwell Roof Replacement June 5,2018 <br /> WO#UP3662 006363 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.