Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 7/3/2018 7:43 <br /> Issued By HLJ HUSBY,LANCE J. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 5/17/2018 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 15 3 <br /> Title CONVERT.75 INCH 222 BROOKRIDGE BLVD UT3473-15-3 <br /> Work Order No 20181320 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 5/17/2018 Time 14:48 Original WO Billing <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROGRAM. <br /> Structure ID StrTvp Activity Compl Date Comments <br /> WS0184R073 WASRVC YES 6/20/2018 <br /> Address 222 BROOKRIDGE BLVD <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 222 BROOKRIDGE BLVD <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34150747 ADAPTER 3/4 MIP X 1 RIBBED INSERT FOR IPS PE PIPE 1 10.882 06/20/2018 PAP <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 1 15.264 06/20/2018 PAP <br /> M ELL034154947 ELBOW 3/4 NPT 45 DEG STREET BRASS(1/8 BEND) 1 4.381 06/20/2018 PAP <br /> M ELL034104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 1 3.881 06/20/2018 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE WJE-CODER R9001 CU FT STUB ANTENNA 1 191.26 06/20/2018 PAP <br /> M SETT34146547 SETTER COPPER 5/8 X 3/4 HEIGHT 9"NO LEG LENGTH HI/HO 1 110.881 06/20/2018 PAP <br /> Total Material Cost $336.54 <br />