Laserfiche WebLink
Deck Anatomy <� dec ks.com <br /> � <br /> ,,, , <br /> l� 1 <br /> ,, ., ,, <br /> _____-- <br /> , . . , <br /> �� _, ,_ �� Figure 1 <br /> Illi,\\''''*..\',\ , , <br /> • <br /> '. \\41.4\/ \ ,„ <br /> Ik / - c r:1 ` =`�'' `/ci f F f / \ <br /> 11 <br /> A <br /> cc' ..-ti f -- <br /> "V ..'' _, \':. \ ,..\ <br /> O - ` �� --f ,- i \ /1 <br /> `` r i``* Z.% <br /> �`/ <br /> �� \ - ' <br /> 0 <br /> Legend O <br /> N <br /> A. Joist Hangers O <br /> B. Flashing `' <br /> C. Structural Bolts <br /> D. Joist <br /> E. Double Rim Joist - -1 <br /> F. Top & Bottom Rails <br /> G. Decking <br /> H. Blocking <br /> I. Post Base Connector <br /> J. Post Beam Connector Design Loads <br /> K. Beam All decks shall be designed to support a live load of 40 lbs. per square foot and <br /> L. Rail Post a dead load of 15 lbs. per square foot. <br /> M. Support Post Wood Requirements <br /> N. Footing & Pier Unless noted otherwise in these details, all framing lumber shall be Southern <br /> 0. Stringer Hanger Pine, Grade#2 or better and shall be pressure treated ACQ or CA-B in accor- <br /> P. Balusters dance with American Wood-Preservers'Association Standards.All lumber in <br /> Q. Stair Stringer contact with the ground shall be rated as "ground contact". Please note that not <br /> R. Rail Top Cap all treated lumber is rated for ground contact. <br /> S. Hand Rail Hardware & Fasteners <br /> T. Stair Treads All hardware and fasteners (joist hangers, post anchors, mechanical fasteners, <br /> nails, screws, bolts, etc.) shall be galvanized with 1.85 oz/sf of zinc (G-185 <br /> U. Stair Risers Coating) <br /> . 06)� � Deck Construction Guide Decks.com ©2016 <br /> \.1' <br />