Laserfiche WebLink
• <br /> Residential Photovoltaic OTC Permit Application <br /> • <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> • in this Checklist.All project plans and supporting documentation must be provided on site for the Inspector. <br /> • <br /> —___TO BE COMPLETED BY APPLICANT <br /> 0 Project Information <br /> Property Owner Name: Kelly Berger <br /> Project Address: 5912 Larimer Rd Parcel# 28050500402800 <br /> City: Everett State: WA ZIP: 98208 <br /> Day Phone: (206)251-7702 <br /> Contractor Name Smart Energy Today <br /> Contractor License#: SMARTET869RJ <br /> ,Contractor Day Phone: 360-339-6660 <br /> PV system description Installation of residential rooftop pv solar system 5.22kW with micro-inverters <br /> (include manufacturer containing automatic rapid shutdown <br /> and model#of PV (18x) Itek Energy IT290-SE-Modules <br /> modules and (9x) Blue Frog Solar YC500A-MIW Micro-Inverters <br /> inverters): <br /> ()Determine minae if your project qualifies for expedited permitting: <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that <br /> Is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules.[IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by �r ❑ <br /> the local jurisdiction. <br /> 3. Rooftop is made from lightweight material such'as a single layer of composition shingles, 21 ❑ <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The Installation shall comply with the manufacturer's instructions.[IRC M2302.2] IV 0 <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to Et 0 <br /> administer the electrical code.[IRC M2302.2] <br /> 6. The installation shall meet the requirements of the International Fire Code as amended .2, <br /> by WA State.[IRC M2302.2] <br /> 7. The PV system is designed for the wind speed of the local area,and will be installed per Ei G1 <br /> the manufacturer's specifications. [IRC M2302,2.1(1)] , <br /> 8. The ground snow load does not exceed 70 pounds per square foot.[IRC M2302.2.1(2)] EV 0 <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds persquare foot.[IRC M2302.2,1(3)] If ` 0 <br /> Enter total dead load of system(lbs/ft2): <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the 6�, ❑ <br /> roofing to which they are affixed. [IRC M2302,2.1(4)] <br />