Laserfiche WebLink
Construction Stormwater Plan: <br /> All new development and redevelopment projects are responsible for preventing erosion and <br /> sedimentation during construction. Each of the 13 requirements below contains a list of BMPs that <br /> are accepted by the Department of Ecology for satisfying each requirement.(For more information on <br /> each BMP,please go to Chapter 4 in Volume II of Ecology's Stormwater Management Manual for <br /> Western Washington: https://fortress.wa.gov/ecy/publications/parts/1410055part4.pdf). <br /> Please select all BMPs that you will be using to satisfy each requirement,and where applicable, <br /> show these items on a map of your project.All requirements must have at least one item selected: <br /> 1. Preserve Vegetation/Mark Clearing Limits: <br /> 'IABMP C101: Preserving Natural Vegetation <br /> OBMP C102: Buffer Zones <br /> OBMP C103:High Visibility Plastic or Metal Fence <br /> 2. Establish Construction Access: <br /> (SBMP C105:Stabilized Construction Entrance/Exit <br /> OBMP C106:Wheel Wash <br /> DBMP C107:Construction Road/Parking Area Stabilization <br /> 3. Control Flow Rates: <br /> OBMP C203:Water Bars <br /> OBMP C240:Sediment Trap <br /> OBMP C241:Temporary Sediment Pond <br /> Not Applicable To My Proposed Project <br /> 4. Install Sediment Controls: <br /> OBMP C231: Brush Barrier <br /> DBMP C232:Gravel Filter Berm <br /> giBMP C233:Silt Fence <br /> OBMP C234:Vegetated Strip <br /> OBMP C235:Wattles <br /> OBMP C240:Sediment Trap <br /> OBMP C241:Temporary Sediment Pond <br /> 5. Stabilize Soils: <br /> '®BMP C120:Temporary and Permanent Seeding <br /> OBMP C121: Mulching <br /> OBMP C122: Nets and Blankets <br /> `' $]BMP C123: Plastic Covering <br /> OBMP C124:Sodding <br /> OBMP C125:Topsoiling/Composing <br /> OBMP C126:Polyacrylamide for Soil Erosion Protection <br /> OBMP C130:Surface Roughening <br /> OBMP C131:Gradient Terraces <br /> OBMP C140:Dust Control <br /> Page6of7 <br />