My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5701 LOMBARD AVE 2018-07-18
>
Address Records
>
LOMBARD AVE
>
5701
>
5701 LOMBARD AVE 2018-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2018 11:21:55 AM
Creation date
7/18/2018 11:21:52 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
5701
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Ste Information= <br /> 1. How will your project change the existing conditions? <br /> The home will be rebuilt upon the existing foundation plus an additional 1226sf of new <br /> area(garage with bedrooms above). New concrete driveway and walkways. <br /> 2. Please provide the following quantities of proposed hard surfaces in square feet: <br /> Proposed Roof Area:2150sf <br /> Proposed Other Hard Surfaces(pavement,gravel,etc.):1430sf concrete driveway and <br /> aprons,and 104sf new walkways <br /> 3. How will you manage rooftop runoff after the project is completed?downspouts <br /> directing runoff onto grass or garden, possibility of rain barrels. <br /> 4. How will you manage stormwater runoff from hard surfaces(driveways,paved <br /> pathways,patios,etc.)?Evaluate each type of hard surface separately.The driveway and <br /> all paved pathways will be surrounded by grass lawn or garden areas, providing drainage <br /> of rainfall. <br /> Click here to enter text. <br /> Plan for Permanent On-Site Stormwater Management: <br /> You are required to"infiltrate,retain,and disperse stormwater"on your site to the maximum extent <br /> you can without causing erosion or flooding.The goal is to get stormwater runoff in contact with <br /> vegetated surfaces as much as possible before discharging to downstream conveyance systems. <br /> See Volume III,Chapter 12 of the 2010 Storm water Management Manual for stormwater facility <br /> requirements: httos://everettwa.gov/DocumentCenter/Home/View/1214 <br /> 1. Determine which options you must use for managing stormwater from rooftops via downspout <br /> disconnect by considering the following Best Management Practices(BMPs)in order: <br /> • BMP 12.30 On-site Infiltration Areas <br /> • BMP 12.40 Raingardens <br /> • BMP 12.50 Downspout Dispersion <br /> Notes: <br /> a. If location criteria can be met, but sizing criteria cannot,you must implement the BMPs to <br /> the maximum extent you can without causing erosion or flooding. Pre-sized facilities have <br /> been designed to meet 100%mitigation. Facilities may be able to be installed to achieve <br /> some stormwater mitigation. <br /> b. Other innovative downspout control BMPs such as rain barrels,ornamental ponds, <br /> downspout cisterns,dry wells,or other downspout water storage devices may also be <br /> used with prior approval by the City of Everett.These are options to consider after the <br /> above listed BMPs are evaluated. <br /> 2. Determine which options you must use for managing stormwater from hard surfaces(driveways, <br /> paved pathways,etc.)by considering the following for each type of hard surface proposed: <br /> • BMP 12.60 Concentrated Flow Dispersion <br /> • BMP 12.70 Sheet Flow Dispersion <br /> Page3of7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.