Laserfiche WebLink
MIN.DISTANCE, / <br /> SEE PLANS FOR LOCATION <br /> 1. CONSTRUCTION FENCE:CHAIN LINK FABRIC TO BE MIN.11 GAUGE, <br /> /y/{�� GALVANIZED,NO RUSTED OR EXCESSIVELY MALFORMED FABRIC. <br /> I,// �� I.SPACE GROUNDCOVER AS INDICATED ON PLANTING 0 <br /> YIYIQQ NOTES: <br /> A. PROVIDE CONSTRUCTION WARNING SIGNAGE 50'O.C.ALONG FENCING PLAN,TRIANGULAR SPACING <br /> INSTALLATION <br /> 2.TOP MULCH,DEPTH VARIES,SEE PLANTING NOTES. JP `gyp <br /> \-\ 4.PREPAREDNDIED SUBGRADE SEE DETAIL 4 THIS SHEET. ,�6 Gq� <br /> ,\ � 4.UNDISTURBED SUBGRADE <br /> . � NODES <br /> A.DO NOT PLANT IN WET CONDITIONS.PROVIDE <br /> \' I / DRAINAGE FROM EACH PLANTING PIT IF NECESSARY. EQUAL <br /> � <br /> II 1) k 12 MAXI <br /> I TRIANGULAR SPACING <br /> TREE PROTECTION �� `� ` '\ �� NOT TO SCALE <br /> ir FENCE,SEE SEC 015639 DBH IIII ' <br /> L4141:::i1 - • <br /> I I44Nolk 441t< o <br /> 0h, <br /> V <br /> 7//% ,I/////. %///////L:F: � <br /> J , z <br /> - I T � \.� 111— 1-111= I-111= 11,// <br /> it I•,\, iPir1LI1II <br /> I—III 0i 1=1 I—IELEV1TION • ` '� \1I ! SPECIALCONSTRUCTION REQUIREMENTS(TRENCHING/E%LAVATION) ■I,1. J MAX '\\�\\/\\//\\//\\//\\/\\/\\/\ <br /> I I I I ZONE A(INTERIOR CRITICAL ROOT ZONE) T <br /> I ZONE B: I y A. NO DISTURBANCE ALLOWED WITHOUT SITE-SPECIFIC INSPECTION <br /> ZONE A X 2 'l AND APPROVAL OF METHODS TO MINIMIZE ROOT DAMAGE <br /> B. SEVERANCE OF ROOTS LARGER THAN 2"DIA REQUIRES <br /> ARBORIST'S APPROVAL <br /> i C. TUNNELING REQUIRED TOINSTALL LINES 3'-0"BELOW GRADE OR TREE PROTECTION &CONSTRUCTION LIMIT FENCE GROUNDCOVER PLANTING <br /> ZONE A: DEEPER <br /> ( = IN FEET IN INCHES— SCALE: 1/2"=1'-0" SCALE: 1"=1'-0" <br /> =DIAZONE B(OUTER CRITICAL ROOT ZONE) <br /> I A. OPERATION OF HEAVY EQUIPMENT AND/OR STOCKPILING OF <br /> EQ EQ i MATERIALS SUBJECT TO OWNER REPRESENTATIVE'S APPROVAL. <br /> SURFACE PROTECTION'MEASURES REQUIRED. <br /> I i. <br /> B. TRENCHING ALLOWED AS FOLLOWS: 1. SUBGRADE LEVEL,MAX.1:1 SLOPE.DEPTH OF <br /> I/ i • EXCAVATION BY HAND OR WITH HAND-DRIVEN TRENCHER MAY EXCAVATION TO ACCOMMODATE COMPOST AND SOIL <br /> / <br /> \I\ '1` BE REQUIRED; DEPTHS. <br /> 2. <br /> • AIR TRENCHING; 1., RIP SUBGRADE TO 8"MIN.DEPTH <br /> • LIMIT TRENCH WIDTH.DO NOT DISTURB ZONE A;MAINTAIN 2/3 0 0 0 [2 3. TILL OR RIP IN 2.5"COMPOST TO 6"DEPTH OF RIPPED <br /> OR MORE OF ZONE B IN UNDISTURBED CONDITION; SUBGRADE. 1. 3"MIN.TOP MULCH-FEATHER BACK <br /> / - • OWNER APPROVAL VARIES 4. CONCRETE THICKENED EDGE OR ADJACENT PAVING 1lf� FROM STEM. <br /> �,\/\ I I C. TUNNELING MAY BE REQUIRED FOR TRENCHES DEEPER THAN ^'^^�'^'^ 5. PLANTING SOIL PER SECTION 32 93 00:INSTALL IN A \ 2. PREPARED PLANTING SOIL <br /> I I 3'-0" MINIMUM OF 2 LIFTS.1ST LIFT TILLED INTO PREPARED 3. REMOVE BURLAP. <br /> /`� \ 12" 4VSUBGRADE. 4. SET MAIN STEM IS 1 T ABO EMERGING ED M <br /> GR <br /> I / ! FENCING/ROOT PROTECTION 6. PLANTING AREA TOP MULCH=3"TOTAL:1"FINE _IIT MAIN STEM IS 1"ABOVE FINISHED GRADE. <br /> A. FENCING TO BE PROVIDED AND MAINTAINED AT UMITS OF 0o 5. ROUGHEN SIDES AND BOTTOM OF HOLE. <br /> iAll <br /> ,' l `/ `' 2y„ r","/„1, <br /> � O COMPOST* MULCH ON TOP OF COMPOST / <br /> \ OUTER CRITICAL ROOT ZONE-SEE PLANS FOR LOCATION 2 �� �4� "® /�®G®'/� 0 MULCH.FOR AREAS OF GROUNDCOVER REDUCE BARK 0 6. COMPACT SOIL FOR FIRM BASE. <br /> '— / B. ARBORISTS APPROVAL REQUIRED FOR USE/ACCESS WITHIN ZONE � © MULCH TO I". 1� 7. PREPARED SUBGRADE AND PLANTING <br /> " B 8" ail) <br /> 0 SOIL. <br /> i C. PERMISSION FOR USE/ACCESS REQUIRES SURFACE PROTECTION © NOTES: B. WHEN PLANTING SHRUBS WITHIN <br /> 1 / <br /> FOR ALL UNFENCED,UNPAVED SURFACES WITHIN CRITICAL ROOT A. AT END OF WARRANTY SUPPLEMENT TOP MULCH TO 0 , Q 0 PLANTING BED,EXTEND TOP MULCH TO <br /> ZONE ACHIEVE FINAL TOTAL DEPTH OF 3"(2"IN EDGE OF BED. <br /> "SURFACE PROTECTION MEASURES GROUNDCOVER AREAS). H.����j ���,���rp���% 9. 6"BERM AROUND PLANTING PIT. <br /> • TEMPORARY ACCESS:MULCH LAYER,6"-8"DEPTH,&3/4" B. FINISH SURFACE OF MULCH TO BE N"BELOW ADJACENT f r� lC <br /> \ r PLYWOOD SHEETS PAVEMENT. -iN NOTES: <br /> • RECURRING ACCESS:MULCH LAYER,6"-8"DEPTH,&STEEL C. SEE GENERAL PLANTING NOTES FOR MULCH DEPTH IN i—II Mt O A.DO NOT PLANT IN WET CONDITIONS, <br /> \ / - - - - \� PLATES PLANTING AREAS. 4�JNapaarlL� -- PROVIDE DRAINAGE FROM EACH PLANTING <br /> ‘,/,," <br /> ` / \6" P/ /, 0 <br /> PIT IF NECESSARY. <br /> B.SPACING TO BE TRIANGULAR UNLESS <br /> SHOWN OTHERWISE. <br /> I / / MIN. /BA /// <br /> PLAN <br /> TREE PROTECTION SUBGRADE AND SOIL PREP-PLANTING AREAS SHRUB PLANTING <br /> SCALE: 1"=1'-0" SCALE: 1"=1'-0" SCALE: 1"=1'-0" <br /> Q <br /> 01 <br /> N <br /> Ib <br /> 01 <br /> N APPROVED <br /> o PUBLIC W RKS DEP RT ENT <br /> 0 <br /> N �j <br /> D 1 K A <br /> DATE � d <br /> �— <br /> :',tTY OF EVERETT REVIEWED FOR PERMIT <br /> E <br /> 01 <br /> 1 <br /> 0 <br /> N IF SHEET IS LESS THAN 22x34 <br /> a • REDUCE SCALES ACCORDINGLY <br /> 2 <br /> 0' <br /> ENGINEER <br /> SCA <br /> 3 PROJECT. SHMIDT: AS PORT OF EVERETT DWG. NO. L4.02 <br /> CASCADE �C]nf�l� E. SCHMIDT AS NOTED <br /> 111 Port of DESIGN DESIGNED BY: DATE <br /> `Ni�. O COLLABORATIVE E. SCHMIDT FEB. 19, 2016 WATERFRONT PLACE CENTRAL CIF NO. <br /> 1J ��rr INTERIM PUBLIC ACCESS 6-8-001-03 <br /> JIy11�i�iW DRAWN IN CHECKED R <br /> ° _...,.%z,,, IANDSCAPEARCHITECIURE+URBANDESIGN ..stimr R. FINNEY L. LORRY PROJECT <br /> -' , P.O.80X 538 REGISTERED SOUTH MARINA PLAZA N0. PA-SM-2016-03 <br /> 0 EVERETT,WA 98206 1402 31b Ave..Suite 415,Seattle,WA 98101 0 2/19/16 ISSUED FOR BID & CONSTRUCTIONa<7 APPROVED BY: <br /> / (425)259-3164 Ro6)628-91331 cascadedeslgneollab.coLa DETAILS ..,, <br /> SHEET N0. 10 OF 13 <br /> NO. DATE BY REVISION NO. DATE BY REVISION crnrvxw¢HO.n3 <br /> 1 <br />