|
MIN.DISTANCE, /
<br /> SEE PLANS FOR LOCATION
<br /> 1. CONSTRUCTION FENCE:CHAIN LINK FABRIC TO BE MIN.11 GAUGE,
<br /> /y/{�� GALVANIZED,NO RUSTED OR EXCESSIVELY MALFORMED FABRIC.
<br /> I,// �� I.SPACE GROUNDCOVER AS INDICATED ON PLANTING 0
<br /> YIYIQQ NOTES:
<br /> A. PROVIDE CONSTRUCTION WARNING SIGNAGE 50'O.C.ALONG FENCING PLAN,TRIANGULAR SPACING
<br /> INSTALLATION
<br /> 2.TOP MULCH,DEPTH VARIES,SEE PLANTING NOTES. JP `gyp
<br /> \-\ 4.PREPAREDNDIED SUBGRADE SEE DETAIL 4 THIS SHEET. ,�6 Gq�
<br /> ,\ � 4.UNDISTURBED SUBGRADE
<br /> . � NODES
<br /> A.DO NOT PLANT IN WET CONDITIONS.PROVIDE
<br /> \' I / DRAINAGE FROM EACH PLANTING PIT IF NECESSARY. EQUAL
<br /> �
<br /> II 1) k 12 MAXI
<br /> I TRIANGULAR SPACING
<br /> TREE PROTECTION �� `� ` '\ �� NOT TO SCALE
<br /> ir FENCE,SEE SEC 015639 DBH IIII '
<br /> L4141:::i1 - •
<br /> I I44Nolk 441t< o
<br /> 0h,
<br /> V
<br /> 7//% ,I/////. %///////L:F: �
<br /> J , z
<br /> - I T � \.� 111— 1-111= I-111= 11,//
<br /> it I•,\, iPir1LI1II
<br /> I—III 0i 1=1 I—IELEV1TION • ` '� \1I ! SPECIALCONSTRUCTION REQUIREMENTS(TRENCHING/E%LAVATION) ■I,1. J MAX '\\�\\/\\//\\//\\//\\/\\/\\/\
<br /> I I I I ZONE A(INTERIOR CRITICAL ROOT ZONE) T
<br /> I ZONE B: I y A. NO DISTURBANCE ALLOWED WITHOUT SITE-SPECIFIC INSPECTION
<br /> ZONE A X 2 'l AND APPROVAL OF METHODS TO MINIMIZE ROOT DAMAGE
<br /> B. SEVERANCE OF ROOTS LARGER THAN 2"DIA REQUIRES
<br /> ARBORIST'S APPROVAL
<br /> i C. TUNNELING REQUIRED TOINSTALL LINES 3'-0"BELOW GRADE OR TREE PROTECTION &CONSTRUCTION LIMIT FENCE GROUNDCOVER PLANTING
<br /> ZONE A: DEEPER
<br /> ( = IN FEET IN INCHES— SCALE: 1/2"=1'-0" SCALE: 1"=1'-0"
<br /> =DIAZONE B(OUTER CRITICAL ROOT ZONE)
<br /> I A. OPERATION OF HEAVY EQUIPMENT AND/OR STOCKPILING OF
<br /> EQ EQ i MATERIALS SUBJECT TO OWNER REPRESENTATIVE'S APPROVAL.
<br /> SURFACE PROTECTION'MEASURES REQUIRED.
<br /> I i.
<br /> B. TRENCHING ALLOWED AS FOLLOWS: 1. SUBGRADE LEVEL,MAX.1:1 SLOPE.DEPTH OF
<br /> I/ i • EXCAVATION BY HAND OR WITH HAND-DRIVEN TRENCHER MAY EXCAVATION TO ACCOMMODATE COMPOST AND SOIL
<br /> /
<br /> \I\ '1` BE REQUIRED; DEPTHS.
<br /> 2.
<br /> • AIR TRENCHING; 1., RIP SUBGRADE TO 8"MIN.DEPTH
<br /> • LIMIT TRENCH WIDTH.DO NOT DISTURB ZONE A;MAINTAIN 2/3 0 0 0 [2 3. TILL OR RIP IN 2.5"COMPOST TO 6"DEPTH OF RIPPED
<br /> OR MORE OF ZONE B IN UNDISTURBED CONDITION; SUBGRADE. 1. 3"MIN.TOP MULCH-FEATHER BACK
<br /> / - • OWNER APPROVAL VARIES 4. CONCRETE THICKENED EDGE OR ADJACENT PAVING 1lf� FROM STEM.
<br /> �,\/\ I I C. TUNNELING MAY BE REQUIRED FOR TRENCHES DEEPER THAN ^'^^�'^'^ 5. PLANTING SOIL PER SECTION 32 93 00:INSTALL IN A \ 2. PREPARED PLANTING SOIL
<br /> I I 3'-0" MINIMUM OF 2 LIFTS.1ST LIFT TILLED INTO PREPARED 3. REMOVE BURLAP.
<br /> /`� \ 12" 4VSUBGRADE. 4. SET MAIN STEM IS 1 T ABO EMERGING ED M
<br /> GR
<br /> I / ! FENCING/ROOT PROTECTION 6. PLANTING AREA TOP MULCH=3"TOTAL:1"FINE _IIT MAIN STEM IS 1"ABOVE FINISHED GRADE.
<br /> A. FENCING TO BE PROVIDED AND MAINTAINED AT UMITS OF 0o 5. ROUGHEN SIDES AND BOTTOM OF HOLE.
<br /> iAll
<br /> ,' l `/ `' 2y„ r","/„1,
<br /> � O COMPOST* MULCH ON TOP OF COMPOST /
<br /> \ OUTER CRITICAL ROOT ZONE-SEE PLANS FOR LOCATION 2 �� �4� "® /�®G®'/� 0 MULCH.FOR AREAS OF GROUNDCOVER REDUCE BARK 0 6. COMPACT SOIL FOR FIRM BASE.
<br /> '— / B. ARBORISTS APPROVAL REQUIRED FOR USE/ACCESS WITHIN ZONE � © MULCH TO I". 1� 7. PREPARED SUBGRADE AND PLANTING
<br /> " B 8" ail)
<br /> 0 SOIL.
<br /> i C. PERMISSION FOR USE/ACCESS REQUIRES SURFACE PROTECTION © NOTES: B. WHEN PLANTING SHRUBS WITHIN
<br /> 1 /
<br /> FOR ALL UNFENCED,UNPAVED SURFACES WITHIN CRITICAL ROOT A. AT END OF WARRANTY SUPPLEMENT TOP MULCH TO 0 , Q 0 PLANTING BED,EXTEND TOP MULCH TO
<br /> ZONE ACHIEVE FINAL TOTAL DEPTH OF 3"(2"IN EDGE OF BED.
<br /> "SURFACE PROTECTION MEASURES GROUNDCOVER AREAS). H.����j ���,���rp���% 9. 6"BERM AROUND PLANTING PIT.
<br /> • TEMPORARY ACCESS:MULCH LAYER,6"-8"DEPTH,&3/4" B. FINISH SURFACE OF MULCH TO BE N"BELOW ADJACENT f r� lC
<br /> \ r PLYWOOD SHEETS PAVEMENT. -iN NOTES:
<br /> • RECURRING ACCESS:MULCH LAYER,6"-8"DEPTH,&STEEL C. SEE GENERAL PLANTING NOTES FOR MULCH DEPTH IN i—II Mt O A.DO NOT PLANT IN WET CONDITIONS,
<br /> \ / - - - - \� PLATES PLANTING AREAS. 4�JNapaarlL� -- PROVIDE DRAINAGE FROM EACH PLANTING
<br /> ‘,/,,"
<br /> ` / \6" P/ /, 0
<br /> PIT IF NECESSARY.
<br /> B.SPACING TO BE TRIANGULAR UNLESS
<br /> SHOWN OTHERWISE.
<br /> I / / MIN. /BA ///
<br /> PLAN
<br /> TREE PROTECTION SUBGRADE AND SOIL PREP-PLANTING AREAS SHRUB PLANTING
<br /> SCALE: 1"=1'-0" SCALE: 1"=1'-0" SCALE: 1"=1'-0"
<br /> Q
<br /> 01
<br /> N
<br /> Ib
<br /> 01
<br /> N APPROVED
<br /> o PUBLIC W RKS DEP RT ENT
<br /> 0
<br /> N �j
<br /> D 1 K A
<br /> DATE � d
<br /> �—
<br /> :',tTY OF EVERETT REVIEWED FOR PERMIT
<br /> E
<br /> 01
<br /> 1
<br /> 0
<br /> N IF SHEET IS LESS THAN 22x34
<br /> a • REDUCE SCALES ACCORDINGLY
<br /> 2
<br /> 0'
<br /> ENGINEER
<br /> SCA
<br /> 3 PROJECT. SHMIDT: AS PORT OF EVERETT DWG. NO. L4.02
<br /> CASCADE �C]nf�l� E. SCHMIDT AS NOTED
<br /> 111 Port of DESIGN DESIGNED BY: DATE
<br /> `Ni�. O COLLABORATIVE E. SCHMIDT FEB. 19, 2016 WATERFRONT PLACE CENTRAL CIF NO.
<br /> 1J ��rr INTERIM PUBLIC ACCESS 6-8-001-03
<br /> JIy11�i�iW DRAWN IN CHECKED R
<br /> ° _...,.%z,,, IANDSCAPEARCHITECIURE+URBANDESIGN ..stimr R. FINNEY L. LORRY PROJECT
<br /> -' , P.O.80X 538 REGISTERED SOUTH MARINA PLAZA N0. PA-SM-2016-03
<br /> 0 EVERETT,WA 98206 1402 31b Ave..Suite 415,Seattle,WA 98101 0 2/19/16 ISSUED FOR BID & CONSTRUCTIONa<7 APPROVED BY:
<br /> / (425)259-3164 Ro6)628-91331 cascadedeslgneollab.coLa DETAILS ..,,
<br /> SHEET N0. 10 OF 13
<br /> NO. DATE BY REVISION NO. DATE BY REVISION crnrvxw¢HO.n3
<br /> 1
<br />
|