Laserfiche WebLink
4 Boy <br /> .U1: 2U <br /> PUBLIC WORKS PERMIT Date: 9/16/2016 <br /> Public Works Permit#: PW1609-071 <br /> City of Everett Public Works Department <br /> �� 3200 Cedar Street Parent Permit#: C1606-049 <br /> Everett, WA 98201 Planning Reference#: SUB14-003 <br /> (425)257-8810 <br /> Public Works Fee$: $ 65.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ALPINE HEIGHTS DEVELOPMENT STEVE SNYDER <br /> 120 SW EVERETT MALL WAY ST100 120 SW EVERETT MALL WAY <br /> EVERETT WA 98204 EVERETT WA 98204 <br /> PHONE: PHONE: 3609532800 <br /> TAX PARCEL ID# SITE ADDRESS: 7905 19TH DR SE <br /> CONSTRUCT NEW TOWNHOUSE UNIT-LOT 64 <br /> LOT 64 OF THE PLAT OF ALPINE HEIGHTS. <br /> SITE WORK FOR BUILDING CONSTRUCTED IN APLINE HEIGHTS <br /> LOT 64 OF ALPINE HEIGHTS SUB14-003 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 <br /> prior to starting construction and with other inspection requests. <br /> 6. A sprinkler system is required for this building in compliance with the requirements of �I <br /> NFPA Standards 13D. H <br /> 7. Install erosion control measures as determined by the Public Works Inspector, such <br /> as silt fence, straw bales, swales, or erosion blankets. <br /> 8. Connect side sewer per City Standard#'s 601 through 604. <br /> 9. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 10. All excavated material from foundation, sidewalk, and driveways shall be hauled to <br /> an approved, permitted site. No wasting of material is allowed on this building lot. <br /> 11. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to <br /> be kept clean and open for pedestrian travel. sous n <br /> 12. Driveway to Garage shall be paved. <br /> 13. Site work to be done per plan approved on 09/16/2016. <br /> JUL 1 4 2017 [1.....)) <br /> Public Works Permit Fee Breakdown: <br /> PW Plan Review $20.00 CITY OF EVER <br /> Poi <br /> POSTING PW Site Inspection $20.00 TO O T��� 612'1//h Permit Serviice � <br /> Driveway $25.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> Ce,dr-esotatCity of Everett from any and all claims for damages,costs,expenses,or <br /> causes of action that may arise because of installation and maintenance of the <br /> Appr ed for Construction Date improvement or other right-of-way use hereto applied for and further agrees to <br /> remove same upon notice from the City and to replace public property <br /> damag-� t ereby/ <br /> FINAL INSPECTION Date � /� 71)1/7 <br /> Approved as Constructed ature • i <br /> g to a o` plicant <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />