Laserfiche WebLink
• I <br /> PUBLIC WORKS DEPARTMENT E-MAI <br /> 4.77 Utilities Division,3200 Cedar Street <br /> Everett WA 98201 LEDpi <br /> 3;_-,X0-1 )‘ <br /> 425-257-8800 � �--- -- <br /> COST ESTIMATE SHEET L. <br /> Receipt # Date Paid <br /> X Cost of Work Order $2712.00 Work Order# <br /> Cost of Service Order Service Order# <br /> Contact Person Paul Bustard Telephone# 425 876-6551 <br /> Requested By Benyam S Date of Request 3-26-2018 <br /> Property Owner(name) Bustard Custom Construction Inc <br /> Charge Cost to(name if different than owner) <br /> Address P 0 Box 1243 City Marysville,WA Zip 98270 <br /> Installation Location 5109 Chinook Dr <br /> Installation type/description/size/etc. Modification of existing service: Change exsiting 3/4" water <br /> service to 1" metered service. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 4"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $952.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $1270.00 Matt Welborn <br /> Equipment Rental $360.00 Randy Allen <br /> Paul McKee <br /> Tax $130.00 Jim Spooner <br /> Sabrina Fandler <br /> Restoration <br /> Benyam-Stephanos <br /> TOTAL $2712.00 <br /> Prepared by: Jim Spooner F) Date Estimate Prepared 3-26-2018 <br /> Accepted by: Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2018\5109 Chinook CEFP <br /> 1 of 1 <br />