My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4816 COLLEGE AVE 2018-07-24
>
Address Records
>
COLLEGE AVE
>
4816
>
4816 COLLEGE AVE 2018-07-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2018 2:41:29 PM
Creation date
7/24/2018 2:41:27 PM
Metadata
Fields
Template:
Address Document
Street Name
COLLEGE AVE
Street Number
4816
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_. PUBLIC mORKS PERMIT Date: 6/17/2016 <br /> f' City of Everett Public Works Department Public Works Permit#: PW1606-029 <br /> b. � <br /> 3200 Cedar Street Parent Permit#: B1606-025 <br /> Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 65.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MATTHEWS DAVID L& ERIN <br /> 4816 COLLEGE AVE <br /> EVERETT WA 98203 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# 00606900200300 SITE ADDRESS: 4816 COLLEGE AVE <br /> CONSTRUCT DETACHED GARAGE <br /> VISTA HEIGHTS ADD BLK 002 D-00- <br /> LOT 3 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 -=, , d n_ <br /> 4. Downspouts for new garage shall discharge to splash blocks or other method as ,".-x;--...� 1--._. , ., ,-•t•-.. A P ,"' <br /> reviewed and approved by the Public Works Inspector. q <br /> 5. No dirt, mud, rocks, or debris to be tracked onto roadway. =: .)=:: •) , <br /> r1"1 1,— ati m �) Cr) <br /> 6 Stormwater from new impervious surfaces shall not be discharged, through max;r??' snti [�I <br /> downspouts or other direct pipe connections, into a combined sewer, including a lateral =1 F"t <br /> line or side sewer connected to the City's combined sewer system as per EMC Chapter - r , ,; V) <br /> t-r14.08.180 H. c �� -1 <br /> 7. It is the applicant/owner's responsibility to ensure that stormwater runoff from Nifty r: <br /> impervious surfaces will be managed on-site in a manner that does not adversely ale€ect <br /> neighboring properties, including the City's right-of-way and/or easements and the ' 7 h <br /> improvements located therein. '„Ha I,:F.rt :1— *I:-F SMF a w <br /> 8. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 tidt~'0=1 r='' `1.-'' <br /> to starting construction and with other inspection requests and review of the site r�'`° '- 1--� �_ 1 <br /> drainage concerns.See attached to request an inspection. _ : : E.0 <br /> 9. If the garage is setback from the alley right of way then that area between the garage "`` ' <br /> and the alley shall be paved. Review this requirement with the Public Works Inspector <br /> for applicability. <br /> Public Works Permit Fee Breakdown: PO <br /> Misc. Minor Permits) $25.00 TO POSTING 2/—"---:--- <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> 6 1 7-/ 6 causes of action that may arise because of installation and maintenance of the <br /> Appr ed for Construction Date improvement or other right-of-way use hereto applied for and further agrees to <br /> remove same upon notice from the City and to replace public property <br /> /�~ r damaged thereby. <br /> IFI11�lAL INSPECTION Date ) _-,e----- *C4z. <br /> Approved as Constructed Si nature of pplicant <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> . s <br />
The URL can be used to link to this page
Your browser does not support the video tag.