Laserfiche WebLink
t y <br /> 18 October 2017 <br /> Building Inspector <br /> City of Everett, Public Works <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> RE: McMains Addition <br /> 240 Heather Road, Everett,Washington <br /> Dear Inspector <br /> `Please accept this"letter and attached revised details as confirmation of the following on site <br /> foundation/floor framing changes. <br /> 1. Floor framing is acceptable as shown in the attached revised detail 3/A2. Ledger shall be pressure <br /> treated and epoxy,kolted into concrete foundation wall. Hang joist from ledger, all other <br /> components of the perimeter foundation detail and notes shall be installed per plan. <br /> 2. Interior post and beam line shall be installed per attached detail 2/A2 to provide adequate <br /> clearance in crawl space.All other components of the interior floorframing,bearing; detanl and <br /> notes shall be installed per plan. <br /> If you have any questions please call 425-344-9942 or contact me at <br /> GonzalesDesignPartners@hotmail.com <br /> Sincerely, <br /> Ruth E. Gonzales,Architect#5360 <br /> Gonzales Design Partners <br /> P.O. Box 97 <br /> Arlington,Washington 98223 <br />