Laserfiche WebLink
INSPECTION REPORT <br /> / _ Date 0 /-7 Permit: `//1z/ <br /> Contractor: t�g`/1&G4` <br /> Owner: i ///j_S <br /> Site Address: ,Z02 Ar Vii/ yI _ Q_____- <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> _ ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> eallectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: 212-5- 3k-0 f?&/ <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THI PE- <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION 4,. <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 1 <br /> I <br /> i <br /> 1 a I <br /> 1 <br /> 1 <br /> 1 c---t 1.-__Ari---(._ <br /> 1i <br /> l <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> j Inspector: `/ I Date: t q <br /> EIR(10/06) DATABAR,INC. <br />